What the service covers
substrate assessment, board installation and build-up to finished tile level

Substrate assessment
Check slab levelness and concrete condition before any work starts

Surface preparation
Clean, patch cracks and ensure full board adhesion across the slab

Insulation board fixing
Bond rigid boards with compatible adhesive and set to a true level

Compression screed
Thin screed over the board carries tile load and daily foot traffic

Wet-area waterproofing
Waterproofing membrane applied over insulation in bathrooms and kitchens

Final tile installation
Tiling with compatible mortar and flexible joints to absorb thermal movement
Materials and methods used
Extruded polystyrene (XPS) board
High compressive strength handles foot and furniture load; closed-cell structure resists moisture absorption under screed
Compressed perlite board
Lightweight natural mineral that handles roof-deck humidity and provides stable thermal resistance under heavy tile
Flexible tile adhesive mortar
Absorbs differential thermal expansion between board and tile, preventing tile lifting during Kuwait's extreme summer heat
Thermal movement silicone joints
Placed at room perimeters and columns to absorb slab movement and prevent grout cracking at edges
Common mistakes that ruin the insulation
Under-thickness board
Board thinner than specified delivers negligible thermal resistance and makes the whole exercise pointless
Omitting movement joints
Without perimeter joints, tiles buckle or grout cracks when slabs expand in summer heat
Partial board bonding
Spot-bonding only leaves air voids that form thermal bridges and allow boards to rock under load
Skipping the screed layer
Tiling straight onto board without screed causes uneven tiles and crushes the board under point loads
More in thermal insulation.
What goes wrong with most finishing.
The finish is what you see every day, and its mistakes do not hide. These three are the most common.
01A rushed finish
The finish is what you live with every day. Rushing it shows in every corner.
02Four contractors for one finish
Tiling, gypsum, paint and aluminium crews who never talk to each other.
03After-care that never comes
Once you have the keys, it is hard to find anyone to come back and fix what shows up.
The solution?
Full finishing, and maintenance after it, from one licensed company.

A rushed finishTurnkey finishing
Marble, tiling, gypsum and paint from one company.

Four contractors for one finishOne company for every trade
No gaps between the tiler, the gypsum crew and the painter.

After-care that never comesRegular maintenance after handover
And finishing on instalments if you need it.
How it works.
Call or whatsApp
Describe the space and approximate area to book a site visit
Site assessment
We measure floors, check slab condition and note any level differences
Quotation
We provide a written quote specifying board thickness, materials and method
Installation
Prep, board bonding, screed pour, then finished tile installation
Inspection and handover
Level checks and joint inspection before formal handover to you
What sets the price.
No fixed rate applies; these factors shape the quote for each project
Get a quoteTotal area
Larger floor areas reduce the relative cost per square metre
Required board thickness
Thicker boards mean more material and a deeper levelling screed above
Tile type above
Heavy marble requires higher-compressive-strength board than standard ceramic tile
Existing surface condition
Uneven or cracked slabs need remedial work before boards can be bonded
Waterproofing requirement
Wet areas need a waterproofing membrane on top of the thermal board
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
Under-tile thermal insulation in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Kuwait Fire Force (safety requirements in finishing work)
Questions, answered.
Call nowCan under-tile insulation be installed during a renovation without raising ceiling heights noticeably?
Yes. Board thickness typically ranges from 20 to 50 mm and can be partly offset by a thinner screed. The effect on room height is small and is calculated before work begins.
Is under-tile insulation useful only on ground floors, or does it also benefit upper floors?
It works well on both. Ground floors gain protection from moisture and cold ground, while upper floors under a sun-exposed slab benefit directly from reduced heat coming through the ceiling below.
Is XPS board safe under heavy marble tiles?
Yes, provided the correct compressive-strength grade is selected. Floor-grade XPS handles furniture and daily traffic, and a screed layer above it distributes the load evenly before marble is laid.
Does under-tile insulation work on walkable roof decks?
Yes, and it is one of the better options for walkable roofs. The board sits under the roof tiles and simultaneously insulates and shields the waterproofing membrane from UV and direct heat.
Why do tile grout joints crack shortly after installation in Kuwait?
The most common cause is missing perimeter movement joints. Intense heat expands both tile and slab, crushing rigid grout. Proper under-tile insulation combined with flexible edge joints significantly reduces that movement.