
Under-tile thermal insulation in Sharq
Under-tile thermal insulation in Sharq stops heat transfer from the floor before it reaches the storey above. We assess the concrete substrate, install thermal insulation boards and build up to finished tile level. This thermal break is essential in residential and mixed-use towers to reduce heat gain from exposed slab surfaces.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Sharq comprises tall residential towers and mixed commercial buildings with glazed facades and sun-exposed floor slabs, raising heat gain through the floors. Each storey requires careful inspection of the concrete substrate and fine cracks that may transmit both moisture and heat together. Thermal insulation boards (foam or mineral wool) are installed directly on the cleaned surface, with a vapour barrier underneath to prevent moisture pooling between layers. We then pour a levelling screed of uniform thickness before tile-setting, accounting for final floor height to align with door frames and fixtures.
Sharq is located in Capital governorate, where tall residential towers and office buildings cluster near Kuwait Towers and the Gulf waterfront.
Sun-exposed floor slabs in residential towers require concrete moisture testing before thermal insulation board installation.

What the service covers
substrate assessment, board installation and build-up to finished tile level

Substrate assessment
Check slab levelness and concrete condition before any work starts

Surface preparation
Clean, patch cracks and ensure full board adhesion across the slab

Insulation board fixing
Bond rigid boards with compatible adhesive and set to a true level

Compression screed
Thin screed over the board carries tile load and daily foot traffic

Wet-area waterproofing
Waterproofing membrane applied over insulation in bathrooms and kitchens

Final tile installation
Tiling with compatible mortar and flexible joints to absorb thermal movement
How it works.
Call or whatsApp
Describe the space and approximate area to book a site visit
Site assessment
We measure floors, check slab condition and note any level differences
Quotation
We provide a written quote specifying board thickness, materials and method
Installation
Prep, board bonding, screed pour, then finished tile installation
Inspection and handover
Level checks and joint inspection before formal handover to you
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Under-tile thermal insulation
Other services in Sharq
Questions about Under-tile thermal insulation in Sharq
Call nowIs under-tile thermal insulation important in tall residential towers?
Yes, sun-exposed floors in towers absorb significant heat. Thermal insulation reduces heat transmission to the storey above and lessens the cooling load on the air-conditioning system measurably.
How do you manage moisture between the insulation boards and the concrete substrate?
We place a vapour barrier directly under the insulation boards on clean, dry concrete. This prevents moisture accumulation between layers, which is essential for the durability of both the insulation and the tile finish.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps