Under-tile thermal insulation in Kuwait - Faiha

Under-tile thermal insulation in Faiha

Under-tile thermal insulation in Faiha blocks heat before it reaches residential floors. We assess the concrete substrate, install insulation boards, and prepare the surface for final tile installation.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Faiha homes are older residential villas on large plots with concrete floors laid directly on soil or thin sand beds. Ground heat radiating in summer noticeably affects interior rooms, especially on lower floors. We inspect the concrete surface for cracks and moisture before installation, fix rigid insulation boards at uniform thickness with tight bonding to seal gaps, then lay an additional horizontal isolation layer before tile set.

Faiha sits in the Capital governorate, a quiet district of residential villas on spacious plots near Faiha Park.

Thermal insulation boards under tile are installed at 25 to 50 mm thickness depending on expected heat load and the existing substrate.

Back to Under-tile thermal insulation

See also: Thermal insulation in Faiha

What the service covers - Under-tile thermal insulation

What the service covers

substrate assessment, board installation and build-up to finished tile level

  • Substrate assessment

    Check slab levelness and concrete condition before any work starts

  • Surface preparation

    Clean, patch cracks and ensure full board adhesion across the slab

  • Insulation board fixing

    Bond rigid boards with compatible adhesive and set to a true level

  • Compression screed

    Thin screed over the board carries tile load and daily foot traffic

  • Wet-area waterproofing

    Waterproofing membrane applied over insulation in bathrooms and kitchens

  • Final tile installation

    Tiling with compatible mortar and flexible joints to absorb thermal movement

How it works.

  1. Call or whatsApp

    Describe the space and approximate area to book a site visit

  2. Site assessment

    We measure floors, check slab condition and note any level differences

  3. Quotation

    We provide a written quote specifying board thickness, materials and method

  4. Installation

    Prep, board bonding, screed pour, then finished tile installation

  5. Inspection and handover

    Level checks and joint inspection before formal handover to you

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Under-tile thermal insulation in Faiha

Call now
Do you inspect the concrete before installing under-tile thermal insulation?

Yes, we inspect the concrete surface for cracks, moisture and surface defects. If we find high moisture levels, we apply a moisture barrier before installing the insulation boards.

What insulation board thickness suits a villa in Faiha?

It depends on the floor base and expected heat load. In Faiha, we typically use 30 to 50 mm boards to achieve effective insulation on lower floors.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works