
Under-tile thermal insulation in Faiha
Under-tile thermal insulation in Faiha blocks heat before it reaches residential floors. We assess the concrete substrate, install insulation boards, and prepare the surface for final tile installation.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most Faiha homes are older residential villas on large plots with concrete floors laid directly on soil or thin sand beds. Ground heat radiating in summer noticeably affects interior rooms, especially on lower floors. We inspect the concrete surface for cracks and moisture before installation, fix rigid insulation boards at uniform thickness with tight bonding to seal gaps, then lay an additional horizontal isolation layer before tile set.
Faiha sits in the Capital governorate, a quiet district of residential villas on spacious plots near Faiha Park.
Thermal insulation boards under tile are installed at 25 to 50 mm thickness depending on expected heat load and the existing substrate.

What the service covers
substrate assessment, board installation and build-up to finished tile level

Substrate assessment
Check slab levelness and concrete condition before any work starts

Surface preparation
Clean, patch cracks and ensure full board adhesion across the slab

Insulation board fixing
Bond rigid boards with compatible adhesive and set to a true level

Compression screed
Thin screed over the board carries tile load and daily foot traffic

Wet-area waterproofing
Waterproofing membrane applied over insulation in bathrooms and kitchens

Final tile installation
Tiling with compatible mortar and flexible joints to absorb thermal movement
How it works.
Call or whatsApp
Describe the space and approximate area to book a site visit
Site assessment
We measure floors, check slab condition and note any level differences
Quotation
We provide a written quote specifying board thickness, materials and method
Installation
Prep, board bonding, screed pour, then finished tile installation
Inspection and handover
Level checks and joint inspection before formal handover to you
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Under-tile thermal insulation
Other services in Faiha
Questions about Under-tile thermal insulation in Faiha
Call nowDo you inspect the concrete before installing under-tile thermal insulation?
Yes, we inspect the concrete surface for cracks, moisture and surface defects. If we find high moisture levels, we apply a moisture barrier before installing the insulation boards.
What insulation board thickness suits a villa in Faiha?
It depends on the floor base and expected heat load. In Faiha, we typically use 30 to 50 mm boards to achieve effective insulation on lower floors.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps