Under-tile thermal insulation in Kuwait - Yarmouk

Under-tile thermal insulation in Yarmouk

Under-tile thermal insulation in Yarmouk reduces heat in apartment and shop floors within mid-rise residential blocks. We assess substrates, install insulation boards, and complete the build-up to the finished surface.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Yarmouk residential and commercial blocks have concrete floors on ground and upper levels, many directly exposed to sun. Before installing insulation boards, concrete must be cleaned of dust, oils and salt, and moisture tested at surface level due to proximity to wet soil layers. Shared floors between multiple units require aligned final levels at partitions and doors, and building tolerance must be maintained between apartments and shops directly below.

Yarmouk sits in the Capital governorate, a district of residential and commercial blocks around Yarmouk Sports Club and adjacent squares.

Surface moisture testing is essential in Yarmouk before insulation due to proximity of wet soil layers beneath foundations.

Back to Under-tile thermal insulation

See also: Thermal insulation in Yarmouk

What the service covers - Under-tile thermal insulation

What the service covers

substrate assessment, board installation and build-up to finished tile level

  • Substrate assessment

    Check slab levelness and concrete condition before any work starts

  • Surface preparation

    Clean, patch cracks and ensure full board adhesion across the slab

  • Insulation board fixing

    Bond rigid boards with compatible adhesive and set to a true level

  • Compression screed

    Thin screed over the board carries tile load and daily foot traffic

  • Wet-area waterproofing

    Waterproofing membrane applied over insulation in bathrooms and kitchens

  • Final tile installation

    Tiling with compatible mortar and flexible joints to absorb thermal movement

How it works.

  1. Call or whatsApp

    Describe the space and approximate area to book a site visit

  2. Site assessment

    We measure floors, check slab condition and note any level differences

  3. Quotation

    We provide a written quote specifying board thickness, materials and method

  4. Installation

    Prep, board bonding, screed pour, then finished tile installation

  5. Inspection and handover

    Level checks and joint inspection before formal handover to you

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Under-tile thermal insulation in Yarmouk

Call now
Can you insulate a floor shared between a residential unit and a shop?

Yes, but final levels must be aligned along the partition between them. We install boards and layers to the same thickness on both sides of the partition to ensure visual and structural consistency.

How do you deal with salt and moisture in floors near wet soil?

We brush the surface with a wire brush and apply dilute acid to remove salt, then test moisture. If elevated, we apply a vapour barrier before boards to prevent moisture rise.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works