Under-tile thermal insulation in Kuwait - Ardhiya Warehouses

Under-tile thermal insulation in Ardhiya Warehouses

Under-tile thermal insulation in Ardhiya Warehouses protects warehouse floors from intense summer heat. We assess the broad concrete base, install insulation boards, and finish the surface for industrial tile.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Ardhiya warehouse buildings sit on thick, broad concrete bases, and floors face intense direct sun and radiant heat bouncing off metal walls. Rising damp from wet soil beneath the warehouses requires careful inspection before insulation. We lay uniform-thickness boards on clean, dry concrete, then cover with heavy plastic sheeting and a cement screed before industrial tile that bears heavy loads.

Ardhiya Warehouses sits in Farwaniya governorate, a district specializing in large storage and logistics facilities.

Warehouse concrete bases are typically 25 to 35 centimetres thick and require water absorption testing before insulation.

Back to Under-tile thermal insulation

See also: Thermal insulation in Ardhiya Warehouses

What the service covers - Under-tile thermal insulation

What the service covers

substrate assessment, board installation and build-up to finished tile level

  • Substrate assessment

    Check slab levelness and concrete condition before any work starts

  • Surface preparation

    Clean, patch cracks and ensure full board adhesion across the slab

  • Insulation board fixing

    Bond rigid boards with compatible adhesive and set to a true level

  • Compression screed

    Thin screed over the board carries tile load and daily foot traffic

  • Wet-area waterproofing

    Waterproofing membrane applied over insulation in bathrooms and kitchens

  • Final tile installation

    Tiling with compatible mortar and flexible joints to absorb thermal movement

How it works.

  1. Call or whatsApp

    Describe the space and approximate area to book a site visit

  2. Site assessment

    We measure floors, check slab condition and note any level differences

  3. Quotation

    We provide a written quote specifying board thickness, materials and method

  4. Installation

    Prep, board bonding, screed pour, then finished tile installation

  5. Inspection and handover

    Level checks and joint inspection before formal handover to you

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Under-tile thermal insulation in Ardhiya Warehouses

Call now
Can floor insulation support forklift loads and heavy industrial tile?

Yes, when using high-density insulation boards and a sufficiently thick cement screed. The screed over insulation bears heavy loads if designed at 5 to 8 centimetres thickness.

How do you handle rising damp from soil beneath the warehouse?

We test moisture with field devices before any insulation. If we find high dampness, we add a thick plastic barrier layer beneath the insulation board to cut rising moisture.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works