
Under-tile thermal insulation in Waha
Under-tile thermal insulation in Waha blocks heat from floor slabs in new villas and residential projects. We assess the concrete substrate, install thermal insulation boards, and build up to finished tile level.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Waha is a modern residential area in Jahra with detached villas and semi-detached villas on medium-sized plots, mostly with thick concrete floor slabs and screed layers. High temperatures in Jahra significantly increase heat loss through concrete floors, making under-tile thermal insulation effective for controlling interior temperatures. We inspect the concrete surface for cracks and rising damp, then lay polystyrene or mineral wool boards at appropriate thickness with a vapour barrier and reinforcement mesh before pouring the bonding layer.
Waha lies in Jahra governorate, a modern residential area of villas and apartment buildings on medium-sized plots exposed to high temperatures.
Floor slabs in Waha villas require 50 to 75 mm thermal insulation thickness to reduce heat loss in Jahra's high temperatures.

What the service covers
substrate assessment, board installation and build-up to finished tile level

Substrate assessment
Check slab levelness and concrete condition before any work starts

Surface preparation
Clean, patch cracks and ensure full board adhesion across the slab

Insulation board fixing
Bond rigid boards with compatible adhesive and set to a true level

Compression screed
Thin screed over the board carries tile load and daily foot traffic

Wet-area waterproofing
Waterproofing membrane applied over insulation in bathrooms and kitchens

Final tile installation
Tiling with compatible mortar and flexible joints to absorb thermal movement
How it works.
Call or whatsApp
Describe the space and approximate area to book a site visit
Site assessment
We measure floors, check slab condition and note any level differences
Quotation
We provide a written quote specifying board thickness, materials and method
Installation
Prep, board bonding, screed pour, then finished tile installation
Inspection and handover
Level checks and joint inspection before formal handover to you
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Under-tile thermal insulation
Other services in Waha
Questions about Under-tile thermal insulation in Waha
Call nowIs thermal insulation necessary in new villas in Waha?
Yes, because high temperatures in Jahra increase heat loss through concrete floors. Insulation reduces the cooling load and improves interior thermal comfort.
Can insulation be installed under tile immediately after concrete pouring?
No, the concrete must cure fully and dry for at least two weeks. Then we inspect it for cracks and moisture before installing insulation boards.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps