
Under-tile thermal insulation in Salhiya
Under-tile thermal insulation in Salhiya blocks heat transfer through floors in the densely packed commercial and residential buildings. We assess the concrete substrate and base surface, then install thermal insulation boards before laying the finished tile.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Salhiya is a mixed commercial and residential district on medium-sized plots, mostly built between the 1990s and 2000s, with concrete floors that are usually flat but may retain moisture or slight slopes toward service runs. Before thermal board installation, we check the surface and remove any protrusions or residual salt from the pour. Polystyrene or fibreglass boards are set with compatible adhesive, then we build up a thin cement layer and reinforcing mesh before tile placement.
Salhiya sits in the Capital governorate, a district of mixed commercial and residential buildings near Salhiya Commercial Complex.
Surface moisture testing is required before thermal board installation to ensure proper adhesion and effective insulation.

What the service covers
substrate assessment, board installation and build-up to finished tile level

Substrate assessment
Check slab levelness and concrete condition before any work starts

Surface preparation
Clean, patch cracks and ensure full board adhesion across the slab

Insulation board fixing
Bond rigid boards with compatible adhesive and set to a true level

Compression screed
Thin screed over the board carries tile load and daily foot traffic

Wet-area waterproofing
Waterproofing membrane applied over insulation in bathrooms and kitchens

Final tile installation
Tiling with compatible mortar and flexible joints to absorb thermal movement
How it works.
Call or whatsApp
Describe the space and approximate area to book a site visit
Site assessment
We measure floors, check slab condition and note any level differences
Quotation
We provide a written quote specifying board thickness, materials and method
Installation
Prep, board bonding, screed pour, then finished tile installation
Inspection and handover
Level checks and joint inspection before formal handover to you
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Under-tile thermal insulation
Other services in Salhiya
Questions about Under-tile thermal insulation in Salhiya
Call nowHow do you handle moisture in older floors before thermal insulation?
We test moisture levels with a specialized meter and ensure the surface dries fully. If needed, we apply a moisture barrier layer before installing the thermal insulation boards.
Can thermal insulation be installed over a floor with slopes toward service runs?
Yes, we first build a thin levelling layer to correct minor slopes, then install the insulation boards and reinforcing mesh over it.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps