Under-tile thermal insulation in Kuwait - Mansouriya

Under-tile thermal insulation in Mansouriya

Under-tile thermal insulation in Mansouriya protects residential buildings from heat gain through floors during the hot summer season. We assess concrete thickness and foundation condition, then install insulation boards in methodical sequence before the finished tile.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mansouriya is a residential district with medium to large plots, comprising villas and apartment buildings built in the last two decades, with concrete floors typically 15 to 20 centimetres thick and uniform slopes toward drainage openings. The sandy soil beneath affects baseline moisture levels, so we test the surface before insulation and install boards of uniform thickness to prevent voids. The adhesive and reinforcing mesh are chosen to withstand interior floor heat without cracking.

Mansouriya sits in the Capital governorate, a residential district on Fourth Ring Road where villas and apartment buildings are dispersed.

Concrete floors in Mansouriya are typically 15 to 20 centimetres thick with uniform slope toward drainage outlets.

Back to Under-tile thermal insulation

See also: Thermal insulation in Mansouriya

What the service covers - Under-tile thermal insulation

What the service covers

substrate assessment, board installation and build-up to finished tile level

  • Substrate assessment

    Check slab levelness and concrete condition before any work starts

  • Surface preparation

    Clean, patch cracks and ensure full board adhesion across the slab

  • Insulation board fixing

    Bond rigid boards with compatible adhesive and set to a true level

  • Compression screed

    Thin screed over the board carries tile load and daily foot traffic

  • Wet-area waterproofing

    Waterproofing membrane applied over insulation in bathrooms and kitchens

  • Final tile installation

    Tiling with compatible mortar and flexible joints to absorb thermal movement

How it works.

  1. Call or whatsApp

    Describe the space and approximate area to book a site visit

  2. Site assessment

    We measure floors, check slab condition and note any level differences

  3. Quotation

    We provide a written quote specifying board thickness, materials and method

  4. Installation

    Prep, board bonding, screed pour, then finished tile installation

  5. Inspection and handover

    Level checks and joint inspection before formal handover to you

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Under-tile thermal insulation in Mansouriya

Call now
Does thermal insulation installation affect the height of interior floors?

Yes, insulation boards at 3 to 5 centimetres plus the reinforcing layer raise the floor slightly. We account for this when designing transitions between rooms and corridors.

What adhesive is best for insulation boards in a hot climate?

We use flexible cement-based adhesive that withstands thermal expansion and contraction. The choice depends on the insulation board type and the expected floor load.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works