
Under-tile thermal insulation in Hassawi
Under-tile thermal insulation in Hassawi blocks exterior heat from apartment and villa floors. We assess the concrete, install the insulation board, and complete the build-up to tile level.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Hassawi is a mixed residential district with villas, apartments and shops on ground floors. Ground-level floors and sun-exposed surfaces need effective thermal insulation because heat penetrates directly through the concrete. We inspect the concrete base for height variations and fine cracks that affect board adhesion, then lay a level sand bed before installing the thermal board. The added layer height must not raise the unit's floor level so much that it affects door and window openings.
Hassawi lies in Farwaniya governorate, an expanding residential district with varied plot sizes and uses.
The thermal insulation layer under tile on ground floors and sun-exposed surfaces requires careful moisture testing before installation.

What the service covers
substrate assessment, board installation and build-up to finished tile level

Substrate assessment
Check slab levelness and concrete condition before any work starts

Surface preparation
Clean, patch cracks and ensure full board adhesion across the slab

Insulation board fixing
Bond rigid boards with compatible adhesive and set to a true level

Compression screed
Thin screed over the board carries tile load and daily foot traffic

Wet-area waterproofing
Waterproofing membrane applied over insulation in bathrooms and kitchens

Final tile installation
Tiling with compatible mortar and flexible joints to absorb thermal movement
How it works.
Call or whatsApp
Describe the space and approximate area to book a site visit
Site assessment
We measure floors, check slab condition and note any level differences
Quotation
We provide a written quote specifying board thickness, materials and method
Installation
Prep, board bonding, screed pour, then finished tile installation
Inspection and handover
Level checks and joint inspection before formal handover to you
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Under-tile thermal insulation
Other services in Hassawi
Questions about Under-tile thermal insulation in Hassawi
Call nowCan we install under-tile insulation on a ground-floor villa floor in Hassawi?
Yes, but we test the base moisture and capillary action first. We lay a vapour barrier before the thermal board and ensure side drainage around the villa's foundations.
How much does under-tile insulation raise the floor level?
Typically 40 to 60 mm total between the thermal board (30, 50 mm) and sand layer (around 10 mm). We verify the new level does not interfere with existing door and window openings.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps