
Under-tile thermal insulation in Zahraa
Under-tile thermal insulation in Zahraa blocks heat before it reaches residential floors. We assess the concrete substrate, install the insulation board, and build up the layers to finished tile level.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Zahraa is a residential district with villas and mid-rise apartment blocks, and interior floors are exposed to direct heat through bare concrete substrates. Assessing the concrete surface condition before laying the levelling sand and board is essential, since voids or uneven spots in the base pour reduce insulation performance. We select the thermal board thickness to suit the floor-to-ceiling height and any central heating or cooling layout, and verify the finished tile level aligns with thresholds and doorways in each unit.
Zahraa lies in Hawalli governorate, a residential district with villas and apartment buildings of varying heights.
Thermal insulation board thickness under tile is typically 30 to 50 mm depending on ambient heat levels and the structural design.

What the service covers
substrate assessment, board installation and build-up to finished tile level

Substrate assessment
Check slab levelness and concrete condition before any work starts

Surface preparation
Clean, patch cracks and ensure full board adhesion across the slab

Insulation board fixing
Bond rigid boards with compatible adhesive and set to a true level

Compression screed
Thin screed over the board carries tile load and daily foot traffic

Wet-area waterproofing
Waterproofing membrane applied over insulation in bathrooms and kitchens

Final tile installation
Tiling with compatible mortar and flexible joints to absorb thermal movement
How it works.
Call or whatsApp
Describe the space and approximate area to book a site visit
Site assessment
We measure floors, check slab condition and note any level differences
Quotation
We provide a written quote specifying board thickness, materials and method
Installation
Prep, board bonding, screed pour, then finished tile installation
Inspection and handover
Level checks and joint inspection before formal handover to you
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Under-tile thermal insulation
Other services in Zahraa
Questions about Under-tile thermal insulation in Zahraa
Call nowCan we install effective under-tile insulation in an older villa with older concrete?
Yes, but we start by removing the existing tile and adhesive, then inspect the old concrete and repair any cracks or voids. After that we level the sand bed and lay the thermal insulation board before new tiling.
How much height do the new layers add under the tile after thermal insulation is laid?
Typically we add 40 to 60 mm total: the insulation board (30, 50 mm) and the levelling sand bed (around 10 mm). The finished tile level must align with adjacent room floors and door thresholds.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps