Under-tile thermal insulation in Kuwait - Zahraa

Under-tile thermal insulation in Zahraa

Under-tile thermal insulation in Zahraa blocks heat before it reaches residential floors. We assess the concrete substrate, install the insulation board, and build up the layers to finished tile level.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Zahraa is a residential district with villas and mid-rise apartment blocks, and interior floors are exposed to direct heat through bare concrete substrates. Assessing the concrete surface condition before laying the levelling sand and board is essential, since voids or uneven spots in the base pour reduce insulation performance. We select the thermal board thickness to suit the floor-to-ceiling height and any central heating or cooling layout, and verify the finished tile level aligns with thresholds and doorways in each unit.

Zahraa lies in Hawalli governorate, a residential district with villas and apartment buildings of varying heights.

Thermal insulation board thickness under tile is typically 30 to 50 mm depending on ambient heat levels and the structural design.

Back to Under-tile thermal insulation

See also: Thermal insulation in Zahraa

What the service covers - Under-tile thermal insulation

What the service covers

substrate assessment, board installation and build-up to finished tile level

  • Substrate assessment

    Check slab levelness and concrete condition before any work starts

  • Surface preparation

    Clean, patch cracks and ensure full board adhesion across the slab

  • Insulation board fixing

    Bond rigid boards with compatible adhesive and set to a true level

  • Compression screed

    Thin screed over the board carries tile load and daily foot traffic

  • Wet-area waterproofing

    Waterproofing membrane applied over insulation in bathrooms and kitchens

  • Final tile installation

    Tiling with compatible mortar and flexible joints to absorb thermal movement

How it works.

  1. Call or whatsApp

    Describe the space and approximate area to book a site visit

  2. Site assessment

    We measure floors, check slab condition and note any level differences

  3. Quotation

    We provide a written quote specifying board thickness, materials and method

  4. Installation

    Prep, board bonding, screed pour, then finished tile installation

  5. Inspection and handover

    Level checks and joint inspection before formal handover to you

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Under-tile thermal insulation in Zahraa

Call now
Can we install effective under-tile insulation in an older villa with older concrete?

Yes, but we start by removing the existing tile and adhesive, then inspect the old concrete and repair any cracks or voids. After that we level the sand bed and lay the thermal insulation board before new tiling.

How much height do the new layers add under the tile after thermal insulation is laid?

Typically we add 40 to 60 mm total: the insulation board (30, 50 mm) and the levelling sand bed (around 10 mm). The finished tile level must align with adjacent room floors and door thresholds.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works