Under-tile thermal insulation in Kuwait - Mishref

Under-tile thermal insulation in Mishref

Under-tile thermal insulation in Mishref protects villas and residential buildings from heat gain through floors. We assess concrete and soil condition, then carefully install insulation boards before laying finished tile over the reinforcing layer.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mishref is a residential district with villas and apartments on relatively large plots, most buildings constructed between the 1990s and 2000s on mixed clay and sandy soil. Concrete floors here are typically 20 to 25 centimetres thick with possible slight slopes toward exterior surfaces. Before installing insulation boards, we check baseline moisture levels and surface cracks, as clay soil can cause minor movement. Expanded polystyrene boards are set with flexible adhesive to withstand any ground movement, then reinforced with metal mesh before tiling.

Mishref sits in Hawalli governorate, a residential district of villas and apartments near Kuwait University and Mishref Park.

Floors in Mishref are typically 20 to 25 centimetres thick on clay soil that may cause minor building movement.

Back to Under-tile thermal insulation

See also: Thermal insulation in Mishref

What the service covers - Under-tile thermal insulation

What the service covers

substrate assessment, board installation and build-up to finished tile level

  • Substrate assessment

    Check slab levelness and concrete condition before any work starts

  • Surface preparation

    Clean, patch cracks and ensure full board adhesion across the slab

  • Insulation board fixing

    Bond rigid boards with compatible adhesive and set to a true level

  • Compression screed

    Thin screed over the board carries tile load and daily foot traffic

  • Wet-area waterproofing

    Waterproofing membrane applied over insulation in bathrooms and kitchens

  • Final tile installation

    Tiling with compatible mortar and flexible joints to absorb thermal movement

How it works.

  1. Call or whatsApp

    Describe the space and approximate area to book a site visit

  2. Site assessment

    We measure floors, check slab condition and note any level differences

  3. Quotation

    We provide a written quote specifying board thickness, materials and method

  4. Installation

    Prep, board bonding, screed pour, then finished tile installation

  5. Inspection and handover

    Level checks and joint inspection before formal handover to you

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Under-tile thermal insulation in Mishref

Call now
Does thermal insulation protect against clay soil movement?

Flexible adhesive and insulation boards withstand minor soil movement. However, the insulation itself does not stop movement; that is addressed by structural design.

What thickness of polystyrene boards is suitable for villas in Mishref?

We use 4 to 6 centimetres thickness based on thermal insulation requirements and expected load. Greater thickness provides better insulation but raises the floor more.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works