
Under-tile thermal insulation in Abdullah Al-Salem
Under-tile thermal insulation in Abdullah Al-Salem protects residential spaces from heat penetration through floors. We inspect the concrete substrate and install insulation boards to uniform specifications, then build layers to finished level.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Abdullah Al-Salem comprises relatively new villas on regular-sized plots, and their sun-exposed floors need effective insulation. We begin by inspecting the relatively new concrete substrate and confirming freedom from defects, then install the insulation board with strong adhesion. Upper layers include a moisture barrier and a cement levelling coat at consistent thickness for tile stability on a perfectly flat surface.
Abdullah Al-Salem is in Capital governorate, home to a British Embassy and newly built residential villas.
We install the insulation board using the wet-set block method, ensuring full contact between board and concrete substrate.

What the service covers
substrate assessment, board installation and build-up to finished tile level

Substrate assessment
Check slab levelness and concrete condition before any work starts

Surface preparation
Clean, patch cracks and ensure full board adhesion across the slab

Insulation board fixing
Bond rigid boards with compatible adhesive and set to a true level

Compression screed
Thin screed over the board carries tile load and daily foot traffic

Wet-area waterproofing
Waterproofing membrane applied over insulation in bathrooms and kitchens

Final tile installation
Tiling with compatible mortar and flexible joints to absorb thermal movement
How it works.
Call or whatsApp
Describe the space and approximate area to book a site visit
Site assessment
We measure floors, check slab condition and note any level differences
Quotation
We provide a written quote specifying board thickness, materials and method
Installation
Prep, board bonding, screed pour, then finished tile installation
Inspection and handover
Level checks and joint inspection before formal handover to you
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Under-tile thermal insulation
Other services in Abdullah Al-Salem
Questions about Under-tile thermal insulation in Abdullah Al-Salem
Call nowIs installing insulation board on new concrete different from older concrete?
Somewhat. New concrete is less prone to cracks and moisture, but we still clean and prepare it properly before board installation.
Can you install insulation on a large, continuous floor without joints?
Yes, but we follow any structural joints in the concrete substrate and carry them through the insulation and levelling layers to prevent cracking.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps