Under-tile thermal insulation in Kuwait - Abdullah Al-Salem

Under-tile thermal insulation in Abdullah Al-Salem

Under-tile thermal insulation in Abdullah Al-Salem protects residential spaces from heat penetration through floors. We inspect the concrete substrate and install insulation boards to uniform specifications, then build layers to finished level.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abdullah Al-Salem comprises relatively new villas on regular-sized plots, and their sun-exposed floors need effective insulation. We begin by inspecting the relatively new concrete substrate and confirming freedom from defects, then install the insulation board with strong adhesion. Upper layers include a moisture barrier and a cement levelling coat at consistent thickness for tile stability on a perfectly flat surface.

Abdullah Al-Salem is in Capital governorate, home to a British Embassy and newly built residential villas.

We install the insulation board using the wet-set block method, ensuring full contact between board and concrete substrate.

Back to Under-tile thermal insulation

See also: Thermal insulation in Abdullah Al-Salem

What the service covers - Under-tile thermal insulation

What the service covers

substrate assessment, board installation and build-up to finished tile level

  • Substrate assessment

    Check slab levelness and concrete condition before any work starts

  • Surface preparation

    Clean, patch cracks and ensure full board adhesion across the slab

  • Insulation board fixing

    Bond rigid boards with compatible adhesive and set to a true level

  • Compression screed

    Thin screed over the board carries tile load and daily foot traffic

  • Wet-area waterproofing

    Waterproofing membrane applied over insulation in bathrooms and kitchens

  • Final tile installation

    Tiling with compatible mortar and flexible joints to absorb thermal movement

How it works.

  1. Call or whatsApp

    Describe the space and approximate area to book a site visit

  2. Site assessment

    We measure floors, check slab condition and note any level differences

  3. Quotation

    We provide a written quote specifying board thickness, materials and method

  4. Installation

    Prep, board bonding, screed pour, then finished tile installation

  5. Inspection and handover

    Level checks and joint inspection before formal handover to you

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Under-tile thermal insulation in Abdullah Al-Salem

Call now
Is installing insulation board on new concrete different from older concrete?

Somewhat. New concrete is less prone to cracks and moisture, but we still clean and prepare it properly before board installation.

Can you install insulation on a large, continuous floor without joints?

Yes, but we follow any structural joints in the concrete substrate and carry them through the insulation and levelling layers to prevent cracking.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works