Under-tile thermal insulation in Kuwait - Abbasiya

Under-tile thermal insulation in Abbasiya

Under-tile thermal insulation in Abbasiya blocks heat from residential apartment and townhouse floors. We assess concrete and soil, install insulation boards, and finish with a cement layer before tiling.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abbasiya has apartments and small townhouses on direct concrete bases, with sandy soil and moderate moisture. Concrete floors absorb heat especially in ground-floor units and poorly ventilated interior spaces. We inspect the concrete surface for cracks and voids, test dryness before laying polystyrene or fibreglass boards. The thin cement screed over insulation provides a level surface for ceramic or porcelain tile.

Abbasiya sits in Farwaniya governorate, a simple residential district with apartment blocks and small villas on medium-sized plots.

Apartment and townhouse concrete floors are typically 12 to 18 centimetres thick.

Back to Under-tile thermal insulation

See also: Thermal insulation in Abbasiya

What the service covers - Under-tile thermal insulation

What the service covers

substrate assessment, board installation and build-up to finished tile level

  • Substrate assessment

    Check slab levelness and concrete condition before any work starts

  • Surface preparation

    Clean, patch cracks and ensure full board adhesion across the slab

  • Insulation board fixing

    Bond rigid boards with compatible adhesive and set to a true level

  • Compression screed

    Thin screed over the board carries tile load and daily foot traffic

  • Wet-area waterproofing

    Waterproofing membrane applied over insulation in bathrooms and kitchens

  • Final tile installation

    Tiling with compatible mortar and flexible joints to absorb thermal movement

How it works.

  1. Call or whatsApp

    Describe the space and approximate area to book a site visit

  2. Site assessment

    We measure floors, check slab condition and note any level differences

  3. Quotation

    We provide a written quote specifying board thickness, materials and method

  4. Installation

    Prep, board bonding, screed pour, then finished tile installation

  5. Inspection and handover

    Level checks and joint inspection before formal handover to you

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Under-tile thermal insulation in Abbasiya

Call now
Do ground-floor apartments need stronger insulation than upper floors?

Yes, ground-floor units have direct soil contact and absorb more heat. We use thicker, denser insulation boards for ground-level floors.

Does insulation reduce ceiling height in the apartment?

The effect is minimal. Insulation boards are 3 to 5 centimetres thick, and with the screed and tile, floor height rises only about 5 to 7 centimetres.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works