
Under-tile thermal insulation in Ardhiya Industrial
Under-tile thermal insulation in Ardhiya Industrial protects warehouse and workshop floors from high ambient heat. We examine the concrete base, install the insulation board, and build the layers to the finished tile surface.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Ardhiya Industrial is a district of warehouses and workshops with wide, heavily-used concrete floors, and summer ambient heat penetrates the substrate directly. Industrial floors require thorough inspection for cracks and moisture before insulation board installation, since any weakness in the concrete base affects the stability of the insulation and tile above it. We choose the thermal board thickness based on floor area size and direct sun exposure, and lay a compacted, level sand bed to ensure even load distribution across the floor length.
Ardhiya Industrial sits in Farwaniya governorate, a zone dedicated to warehouses, workshops and light manufacturing plants.
Thermal insulation boards in large industrial floors must withstand heavy distributed loads and very high summer temperatures.

What the service covers
substrate assessment, board installation and build-up to finished tile level

Substrate assessment
Check slab levelness and concrete condition before any work starts

Surface preparation
Clean, patch cracks and ensure full board adhesion across the slab

Insulation board fixing
Bond rigid boards with compatible adhesive and set to a true level

Compression screed
Thin screed over the board carries tile load and daily foot traffic

Wet-area waterproofing
Waterproofing membrane applied over insulation in bathrooms and kitchens

Final tile installation
Tiling with compatible mortar and flexible joints to absorb thermal movement
How it works.
Call or whatsApp
Describe the space and approximate area to book a site visit
Site assessment
We measure floors, check slab condition and note any level differences
Quotation
We provide a written quote specifying board thickness, materials and method
Installation
Prep, board bonding, screed pour, then finished tile installation
Inspection and handover
Level checks and joint inspection before formal handover to you
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Under-tile thermal insulation
Other services in Ardhiya Industrial
Questions about Under-tile thermal insulation in Ardhiya Industrial
Call nowCan under-tile thermal insulation withstand heavy loads in warehouses?
Yes, by choosing a high-density, compressed insulation board. We ensure a sound concrete base free of cracks and apply a well-compacted levelling sand layer before the board to distribute loads evenly.
How do you handle moisture that poses a risk to insulation in industrial floors?
We test for moisture and capillary action in the concrete base beforehand. If we find elevated moisture, we lay a vapour barrier under the thermal board and ensure side drainage away from foundations.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps