Under-tile thermal insulation in Kuwait - Daiya

Under-tile thermal insulation in Daiya

Under-tile thermal insulation in Daiya protects residential spaces from direct heat penetration through sun-exposed slabs. We inspect the concrete base and install insulation boards to uniform standards, then raise the build-up to finished level.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya has residential villas and low-rise apartment blocks on medium-sized plots, and their sun-exposed floors require effective under-tile thermal insulation. We begin with careful inspection of the concrete substrate to ensure it is sound, free from micro-cracks and moisture, because minor defects affect board adhesion. After installing the insulation board, we apply a moisture barrier and then a cement levelling coat at even thickness to stabilize the finished tiles.

Daiya is in Capital governorate, home to a British school and public parks among the villas and residential blocks.

We clean the concrete substrate using low-pressure washing before board installation to avoid surface damage.

Back to Under-tile thermal insulation

See also: Thermal insulation in Daiya

What the service covers - Under-tile thermal insulation

What the service covers

substrate assessment, board installation and build-up to finished tile level

  • Substrate assessment

    Check slab levelness and concrete condition before any work starts

  • Surface preparation

    Clean, patch cracks and ensure full board adhesion across the slab

  • Insulation board fixing

    Bond rigid boards with compatible adhesive and set to a true level

  • Compression screed

    Thin screed over the board carries tile load and daily foot traffic

  • Wet-area waterproofing

    Waterproofing membrane applied over insulation in bathrooms and kitchens

  • Final tile installation

    Tiling with compatible mortar and flexible joints to absorb thermal movement

How it works.

  1. Call or whatsApp

    Describe the space and approximate area to book a site visit

  2. Site assessment

    We measure floors, check slab condition and note any level differences

  3. Quotation

    We provide a written quote specifying board thickness, materials and method

  4. Installation

    Prep, board bonding, screed pour, then finished tile installation

  5. Inspection and handover

    Level checks and joint inspection before formal handover to you

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Under-tile thermal insulation in Daiya

Call now
Does the insulation board also block moisture from below?

The insulation board primarily reduces heat transfer. However, we apply a separate moisture barrier above the board to protect the upper build-up from rising dampness.

Can you install insulation board on older concrete with fine cracks?

Fine cracks reduce adhesion efficiency. We treat cracks with light cement injection and clean the surface thoroughly before board installation.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works