Footsteps, dragged chairs and appliance vibration travel through concrete slabs; a resilient floating layer and a decoupled ceiling below cut the path before the noise reaches you.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates
What the work covers - Floor-to-floor soundproofing

What the work covers

Survey impact paths through the slab, then install decoupling layers and finished surfaces

  • Impact path survey

    Locate where impact noise travels through the slab and columns

  • Resilient underlay layer

    Dense resilient mat installed between the slab and the floating screed

  • Floating floor build-up

    Compression screed poured over the mat without rigid contact with walls

  • Perimeter isolation strip

    Resilient strip around the room perimeter blocks vibration transfer through the wall base

  • Decoupled ceiling below

    Suspended ceiling hung on resilient channels breaks the downward vibration path

  • Post-installation check

    Impact tap test confirms direct sound paths are sealed before handover

Signs this floor is letting noise through

  1. Footsteps clearly audible

    Every step from the floor above sounds as though it lands inside your room

  2. Chair and furniture scraping

    Furniture dragged on the floor above reaches you clearly and disrupts sleep or work

  3. Appliance vibration felt

    A low hum or vibration in your ceiling when a washing machine or AC unit runs upstairs

  4. Downstairs complains too

    The flat below complains of noise from your floor even though you cannot hear them

Before you call us

  1. Type of noise

    Note whether noise is impact like footsteps or a low hum; each needs a different treatment

  2. Existing floor condition

    Check whether marble or tile sits directly on the slab and who has access to lift it

  3. Access to both floors

    Best results often need work on the upper floor and sometimes the ceiling below too

  4. Available floor height

    A floating floor build-up reduces room height; measure the clearance before the appointment

Part of: Sound insulation

More in sound insulation.

What goes wrong with most finishing.

The finish is what you see every day, and its mistakes do not hide. These three are the most common.

  1. 01

    A rushed finish

    The finish is what you live with every day. Rushing it shows in every corner.

  2. 02

    Four contractors for one finish

    Tiling, gypsum, paint and aluminium crews who never talk to each other.

  3. 03

    After-care that never comes

    Once you have the keys, it is hard to find anyone to come back and fix what shows up.

The solution?

Full finishing, and maintenance after it, from one licensed company.

  1. A bathroom finished in modern marble
    A rushed finish

    Turnkey finishing

    Marble, tiling, gypsum and paint from one company.

  2. A gypsum ceiling with hidden lighting in a modern living room
    Four contractors for one finish

    One company for every trade

    No gaps between the tiler, the gypsum crew and the painter.

  3. A finished modern living room with a marble floor
    After-care that never comes

    Regular maintenance after handover

    And finishing on instalments if you need it.

How it works.

  1. Call or whatsApp

    Describe the affected floor and noise type to book the site visit

  2. Site survey

    We inspect the slab, existing floor and map the impact transmission paths

  3. Quotation

    You receive a detailed quote covering materials, method and work schedule

  4. Layer installation

    Resilient mat, floating screed, perimeter strip and ceiling work installed to spec

  5. Test and handover

    Impact tap test confirms sound paths are closed before final handover

Call now

What sets the price.

No fixed rate applies; these factors shape the quote after the site visit

Get a quote
  1. Slab area treated

    Total area of floor receiving the floating build-up drives overall cost most

  2. Required isolation level

    Residential use needs fewer layers than hotel or commercial occupied floors

  3. Old floor removal

    Breaking out and disposing of existing floor finishes before laying the underlay adds cost

  4. Ceiling below included

    Adding a decoupled suspended ceiling on the underside raises cost and improves the result

  5. Final floor finish

    Large-format porcelain or marble over the floating screed costs more than standard ceramic

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Floor-to-floor soundproofing in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.

Official references: Kuwait Fire Force (safety requirements in finishing work)

Questions, answered.

Call now
Can floor-to-floor soundproofing be done without lifting the upper floor?

If the upper floor is inaccessible, a decoupled suspended ceiling installed from below provides meaningful reduction. Results are better when both the upper floating floor and the ceiling below are treated together, but working from one side alone is possible.

Does a floating floor cause problems with doors and entry thresholds?

A floating build-up raises the floor level by several centimetres. Door clearance and threshold heights must be checked before work starts. We assess this during the survey and recommend door or threshold adjustments where needed.

What is the difference between airborne noise and impact noise between floors?

Impact noise travels through the solid structure, such as footsteps and dragged furniture. Airborne noise, like loud voices or music, travels through air cavities. Both pass between floors, but a floating floor and decoupled ceiling address impact noise most effectively.

Is the perimeter isolation strip necessary if a good-quality resilient mat is used?

Yes. Without a perimeter strip the screed contacts the wall directly, creating a rigid bypass path around the resilient mat. The perimeter strip completes the full decoupling of the floating layer from the building structure.

Does Kuwait's humidity affect the resilient mat under a floating floor?

Resilient mats used in this application are inherently moisture-resistant, but a vapour barrier should be laid beneath them on ground-level floors or above any basement exposed to rising damp from the ground below.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works