Floor-to-floor soundproofing in Kuwait - Faiha

Floor-to-floor soundproofing in Faiha

In Faiha, most residential units have few floors with larger spaces between buildings. Floor-to-floor soundproofing focuses on mapping impact paths through concrete, then installing insulating layers and sealed finished surfaces.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Faiha is a relatively quiet residential area with small buildings of three to four storeys and spacious villas with gardens. Upper-unit noise is less severe here because building density is low and spaces between structures absorb external sound. Within a single building, however, impact sound through the concrete ceiling is direct. We trace the sound path from the upper support point across the slab, then install suspended frames with flexible separators and finish them with composite gypsum and acoustic boards.

Faiha is in the Capital governorate, near Faiha Park and the Faiha Co-op, a quiet residential district.

Buildings in Faiha rarely exceed four storeys, and concrete slab thickness between them ranges from 20 to 25 cm.

Back to Floor-to-floor soundproofing

See also: Sound insulation in Faiha

What the work covers - Floor-to-floor soundproofing

What the work covers

Survey impact paths through the slab, then install decoupling layers and finished surfaces

  • Impact path survey

    Locate where impact noise travels through the slab and columns

  • Resilient underlay layer

    Dense resilient mat installed between the slab and the floating screed

  • Floating floor build-up

    Compression screed poured over the mat without rigid contact with walls

  • Perimeter isolation strip

    Resilient strip around the room perimeter blocks vibration transfer through the wall base

  • Decoupled ceiling below

    Suspended ceiling hung on resilient channels breaks the downward vibration path

  • Post-installation check

    Impact tap test confirms direct sound paths are sealed before handover

How it works.

  1. Call or whatsApp

    Describe the affected floor and noise type to book the site visit

  2. Site survey

    We inspect the slab, existing floor and map the impact transmission paths

  3. Quotation

    You receive a detailed quote covering materials, method and work schedule

  4. Layer installation

    Resilient mat, floating screed, perimeter strip and ceiling work installed to spec

  5. Test and handover

    Impact tap test confirms sound paths are closed before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Floor-to-floor soundproofing in Faiha

Call now
Can soundproofing work in a villa without major structural changes?

If the villa has only two or three storeys and you wish to soundproof the first-floor ceiling, yes, we mount the suspended frames from below without touching the main structure.

What if the concrete ceiling is cracked or uneven?

We inspect it first; if the cracks are only surface-level, we proceed with mounting suspended frames that cover them. If cracks are deep, we may need reinforcement or local repair before soundproofing begins.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works