
Floor-to-floor soundproofing in Sharq
Floor-to-floor soundproofing in Sharq cuts impact noise and footsteps from units above. We survey sound paths through the concrete slab, then install decoupling layers and finished surfaces to block transmission.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Sharq has tall residential towers and luxury villas near the waterfront, many built in earlier decades without modern floor-to-floor sound isolation. Exposed concrete slabs carry footsteps and furniture noise directly to units below, especially in dense residential towers. We assess slab-to-column and partition connections to locate sound leak points, then install flexible decoupling layers under new flooring to block vibration transmission.
Sharq sits in the Capital governorate, a district of tall residential towers and villas near Kuwait Towers and Sharq Marina.
Most concrete slabs in Sharq are 25 to 30 centimetres thick and require decoupling plus a resilient layer of at least 5 centimetres to adequately cut footstep noise.

What the work covers
Survey impact paths through the slab, then install decoupling layers and finished surfaces

Impact path survey
Locate where impact noise travels through the slab and columns

Resilient underlay layer
Dense resilient mat installed between the slab and the floating screed

Floating floor build-up
Compression screed poured over the mat without rigid contact with walls

Perimeter isolation strip
Resilient strip around the room perimeter blocks vibration transfer through the wall base

Decoupled ceiling below
Suspended ceiling hung on resilient channels breaks the downward vibration path

Post-installation check
Impact tap test confirms direct sound paths are sealed before handover
How it works.
Call or whatsApp
Describe the affected floor and noise type to book the site visit
Site survey
We inspect the slab, existing floor and map the impact transmission paths
Quotation
You receive a detailed quote covering materials, method and work schedule
Layer installation
Resilient mat, floating screed, perimeter strip and ceiling work installed to spec
Test and handover
Impact tap test confirms sound paths are closed before final handover
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Floor-to-floor soundproofing
Other services in Sharq
Questions about Floor-to-floor soundproofing in Sharq
Call nowWhat does floor soundproofing do if the slab is already thick?
Thickness alone does not stop footstep and furniture vibrations. You need a flexible decoupling layer under the new flooring to block sound transmission from above, regardless of slab thickness.
Must the old flooring be removed before installing the decoupling layer?
Yes. We inspect the old flooring and mortar on the slab, then remove everything to clean concrete before installing the resilient layer and new flooring correctly.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps