Floor-to-floor soundproofing in Kuwait - Daiya

Floor-to-floor soundproofing in Daiya

Floor-to-floor soundproofing in Daiya reduces footfall and movement noise from the upper floor in residential apartments. We examine impact paths through the slab, then install isolation layers and tight finished surfaces.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya's residential blocks are relatively modern, typically with 4 to 6 units per floor and standard-thickness concrete slabs. Many were built with light base isolation, but resident complaints about footstep noise are common due to poor inter-unit separation. We inspect the base installation quality and remove any obstructions before adding decoupling layers.

Daiya sits in Capital governorate, a secure residential neighbourhood near the British School and public parks.

Most Daiya slabs are 20 to 25 centimetres thick with beam spans not exceeding six metres.

Back to Floor-to-floor soundproofing

See also: Sound insulation in Daiya

What the work covers - Floor-to-floor soundproofing

What the work covers

Survey impact paths through the slab, then install decoupling layers and finished surfaces

  • Impact path survey

    Locate where impact noise travels through the slab and columns

  • Resilient underlay layer

    Dense resilient mat installed between the slab and the floating screed

  • Floating floor build-up

    Compression screed poured over the mat without rigid contact with walls

  • Perimeter isolation strip

    Resilient strip around the room perimeter blocks vibration transfer through the wall base

  • Decoupled ceiling below

    Suspended ceiling hung on resilient channels breaks the downward vibration path

  • Post-installation check

    Impact tap test confirms direct sound paths are sealed before handover

How it works.

  1. Call or whatsApp

    Describe the affected floor and noise type to book the site visit

  2. Site survey

    We inspect the slab, existing floor and map the impact transmission paths

  3. Quotation

    You receive a detailed quote covering materials, method and work schedule

  4. Layer installation

    Resilient mat, floating screed, perimeter strip and ceiling work installed to spec

  5. Test and handover

    Impact tap test confirms sound paths are closed before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Floor-to-floor soundproofing in Daiya

Call now
Do we need to remove existing flooring before installation?

In most cases, yes. We remove tiles, ceramics and cement screed to reach the raw slab, then install flexible decoupling layers and the new finished surface.

How thick will the added layers be?

Decoupling, filling and finished surface layers typically add 8 to 12 centimetres. We choose thickness based on the noise-reduction level needed and available clearance.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works