
Floor-to-floor soundproofing in Daiya
Floor-to-floor soundproofing in Daiya reduces footfall and movement noise from the upper floor in residential apartments. We examine impact paths through the slab, then install isolation layers and tight finished surfaces.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Daiya's residential blocks are relatively modern, typically with 4 to 6 units per floor and standard-thickness concrete slabs. Many were built with light base isolation, but resident complaints about footstep noise are common due to poor inter-unit separation. We inspect the base installation quality and remove any obstructions before adding decoupling layers.
Daiya sits in Capital governorate, a secure residential neighbourhood near the British School and public parks.
Most Daiya slabs are 20 to 25 centimetres thick with beam spans not exceeding six metres.

What the work covers
Survey impact paths through the slab, then install decoupling layers and finished surfaces

Impact path survey
Locate where impact noise travels through the slab and columns

Resilient underlay layer
Dense resilient mat installed between the slab and the floating screed

Floating floor build-up
Compression screed poured over the mat without rigid contact with walls

Perimeter isolation strip
Resilient strip around the room perimeter blocks vibration transfer through the wall base

Decoupled ceiling below
Suspended ceiling hung on resilient channels breaks the downward vibration path

Post-installation check
Impact tap test confirms direct sound paths are sealed before handover
How it works.
Call or whatsApp
Describe the affected floor and noise type to book the site visit
Site survey
We inspect the slab, existing floor and map the impact transmission paths
Quotation
You receive a detailed quote covering materials, method and work schedule
Layer installation
Resilient mat, floating screed, perimeter strip and ceiling work installed to spec
Test and handover
Impact tap test confirms sound paths are closed before final handover
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Floor-to-floor soundproofing
Other services in Daiya
Questions about Floor-to-floor soundproofing in Daiya
Call nowDo we need to remove existing flooring before installation?
In most cases, yes. We remove tiles, ceramics and cement screed to reach the raw slab, then install flexible decoupling layers and the new finished surface.
How thick will the added layers be?
Decoupling, filling and finished surface layers typically add 8 to 12 centimetres. We choose thickness based on the noise-reduction level needed and available clearance.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps