Floor-to-floor soundproofing in Kuwait - Dhaher

Floor-to-floor soundproofing in Dhaher

Impact soundproofing between floors in Dhaher targets noise transmission from upper units directly through the concrete structure. We survey the sound paths through the slab, then install decoupling layers and finished surfaces to cut structural noise.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Dhaher buildings range from villas to residential apartment blocks, many of them older houses on large plots and some newer multi-storey buildings. The concrete slabs in older buildings are often thin and hard, transmitting noise easily between floors, especially footsteps and moving furniture. We use flexible fibre and dense foam decoupling layers under new flooring, with complete separation between the old structure and the new surface.

Dhaher sits in Ahmadi governorate, a residential area far inland in the desert region near the Saudi border.

Most older Dhaher slabs are under 20 centimetres thick, which increases structural sound transmission between floors.

Back to Floor-to-floor soundproofing

See also: Sound insulation in Dhaher

What the work covers - Floor-to-floor soundproofing

What the work covers

Survey impact paths through the slab, then install decoupling layers and finished surfaces

  • Impact path survey

    Locate where impact noise travels through the slab and columns

  • Resilient underlay layer

    Dense resilient mat installed between the slab and the floating screed

  • Floating floor build-up

    Compression screed poured over the mat without rigid contact with walls

  • Perimeter isolation strip

    Resilient strip around the room perimeter blocks vibration transfer through the wall base

  • Decoupled ceiling below

    Suspended ceiling hung on resilient channels breaks the downward vibration path

  • Post-installation check

    Impact tap test confirms direct sound paths are sealed before handover

How it works.

  1. Call or whatsApp

    Describe the affected floor and noise type to book the site visit

  2. Site survey

    We inspect the slab, existing floor and map the impact transmission paths

  3. Quotation

    You receive a detailed quote covering materials, method and work schedule

  4. Layer installation

    Resilient mat, floating screed, perimeter strip and ceiling work installed to spec

  5. Test and handover

    Impact tap test confirms sound paths are closed before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Floor-to-floor soundproofing in Dhaher

Call now
How do you reduce footstep noise from the floor above?

We install a flexible decoupling layer directly over the old concrete slab, then pour a floating floor of wood or tile over it. This double separation cuts structural sound transmission from the upper residents' footsteps.

Does soundproofing raise the current floor level significantly?

The floor rises by 5 to 8 centimetres depending on the decoupling layer thickness and finished surface chosen. We account for this when fitting the doorway, stairs and thresholds.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works