

What the service covers
Cleaning, crack repair and a waterproof coating applied directly over the existing tiled surface

Surface cleaning
Removing dirt, algae and loose material before any coating is applied

Crack and joint sealing
Filling tile cracks and grout lines with a flexible waterproof filler

Flexible waterproof coat
Applying a flexible coating that moves with tiles under Kuwait's thermal cycling

Parapet edge treatment
Reinforcing the junction between tiles and parapet walls against water entry

Drain collar bonding
Bonding the coating tightly around each drain collar, the most common leak point

Post-application check
Reviewing full coverage and marking any spots needing an extra pass
Signs this treatment is what you need
Damp patches on the ceiling below
Yellow or grey patches appear on the top-floor ceiling after rain or roof washing
Crumbling grout lines on the roof
Grout between roof tiles has hollowed out or crumbled, letting water slip underneath
Paint blistering under the slab edge
Paint swelling or flaking at the soffit edge signals moisture absorbed through the deck
Pooling water that drains slowly
Water sits on roof tiles for hours after hosing or rain instead of running off quickly
Things to check before you call
Locate where the leak enters
Find the wet spot on the ceiling and try to link it to a position on the roof above
Check the tile condition
Cracked or hollow tiles must be re-bonded before the waterproof coat is applied over them
When the roof was last washed
A surface thick with algae or grime adds preparation time and affects the coating bond
Planned use of the roof surface
Whether the roof is foot-traffic only or will carry equipment affects which coating grade is used
More in roof waterproofing.
What goes wrong with most finishing.
The finish is what you see every day, and its mistakes do not hide. These three are the most common.
01A rushed finish
The finish is what you live with every day. Rushing it shows in every corner.
02Four contractors for one finish
Tiling, gypsum, paint and aluminium crews who never talk to each other.
03After-care that never comes
Once you have the keys, it is hard to find anyone to come back and fix what shows up.
The solution?
Full finishing, and maintenance after it, from one licensed company.

A rushed finishTurnkey finishing
Marble, tiling, gypsum and paint from one company.

Four contractors for one finishOne company for every trade
No gaps between the tiler, the gypsum crew and the painter.

After-care that never comesRegular maintenance after handover
And finishing on instalments if you need it.
How it works.
Call or whatsApp
Describe the leak or problem and give your property location in Kuwait
Roof inspection
We inspect tiles, grout lines and drain positions to define the scope
Preparation and cleaning
Surface is cleaned, cracked tiles repaired and open joints filled
Coating application
Flexible waterproof coats applied across the field, edges and drain collars
Check and handover
Full coverage reviewed and handover completed once all points are confirmed sealed
What sets the price.
No fixed rate applies; the quote depends on the specific roof conditions and treatment required
Get a quoteTotal roof area
Larger area means more coating material and labour time
Existing tile condition
Cracked or debonded tiles require repair work before the coating can be applied
Number of coating passes
High-traffic or heavily exposed roofs need two or three coats rather than one
Edge and penetration detail
Multiple pipe penetrations and outlets add time for careful sealing around each one
Roof access difficulty
High or awkwardly accessed roofs require extra equipment and longer setup time
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
Over-tile waterproofing in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Kuwait Fire Force (safety requirements in finishing work)
Questions, answered.
Call nowIs over-tile waterproofing a permanent alternative to stripping the roof and starting fresh?
It is a long-lasting solution when the underlying concrete deck is sound and tiles are firmly bonded. If the deck has deep structural cracking or tiles are hollow over large areas, full removal may be the more practical route.
Why do tiled roofs in Kuwait fail more quickly than in milder climates?
Large daily temperature swings expand and contract the tile bed repeatedly, which breaks down grout and sealant. Fine dust also collects in micro-gaps and widens them over time, giving water a direct path to the concrete deck.
Can the coating be applied during Kuwait's summer heat?
Yes, but application is scheduled for early morning before tile surfaces overheat. Tiles that are extremely hot alter curing speed and can affect coating spread, so timing the application is part of proper planning.
Does over-tile waterproofing help reduce heat in the top floor?
Some reflective coating types reduce surface heat absorption slightly, but the primary purpose of this service is waterproofing rather than thermal insulation. For meaningful heat reduction, a separate thermal insulation layer should be added.
How many coats are enough for a tiled roof in Kuwait?
The number depends on the coating type, exposure level and whether the roof sees foot traffic. Typically two coats cover the general field while three are applied at joints, penetrations and edges where stress concentrates.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps






