
Over-tile waterproofing in Zahraa
Over-tile waterproofing in Zahraa addresses the tiled roofs of villas and apartment blocks without removing the old tiles. We clean cracks and buildup, then apply waterproof coating directly over the existing surface to stop water penetration.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Zahraa residential roofs are typically tiled with ceramic or clay tiles over gravel and concrete, and accumulate dirt, algae and hairline cracks from seasonal movement and heat. Villas and two- or three-storey apartment buildings often need resealing after ten years or more. We inspect the tiled surface for wear and damp patches, scrub off dirt and algae with brush and pressure wash, fill any cracks with flexible sealant, then apply layers of waterproof coating.
Zahraa is in Hawalli governorate, a residential district of villas and apartment blocks on medium-sized plots around utility substations.
Most tiled roofs in Zahraa do not need to be broken up and removed before new waterproof coating is applied.

What the service covers
Cleaning, crack repair and a waterproof coating applied directly over the existing tiled surface

Surface cleaning
Removing dirt, algae and loose material before any coating is applied

Crack and joint sealing
Filling tile cracks and grout lines with a flexible waterproof filler

Flexible waterproof coat
Applying a flexible coating that moves with tiles under Kuwait's thermal cycling

Parapet edge treatment
Reinforcing the junction between tiles and parapet walls against water entry

Drain collar bonding
Bonding the coating tightly around each drain collar, the most common leak point

Post-application check
Reviewing full coverage and marking any spots needing an extra pass
How it works.
Call or whatsApp
Describe the leak or problem and give your property location in Kuwait
Roof inspection
We inspect tiles, grout lines and drain positions to define the scope
Preparation and cleaning
Surface is cleaned, cracked tiles repaired and open joints filled
Coating application
Flexible waterproof coats applied across the field, edges and drain collars
Check and handover
Full coverage reviewed and handover completed once all points are confirmed sealed
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Over-tile waterproofing
Other services in Zahraa
Questions about Over-tile waterproofing in Zahraa
Call nowMust we lift all the tiles before applying new waterproof coating?
No. We clean the existing tiles, fill cracks, and apply the waterproof coating directly over them. This saves time and cost while preserving sound tiles.
How often per year should the roof be cleaned of algae before drying?
One annual cleaning is usually enough in Zahraa, especially after the humid season. We recommend inspecting shaded areas and corners where algae grows faster.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps