Over-tile waterproofing in Kuwait - Funaitees

Over-tile waterproofing in Funaitees

Roof waterproofing in Funaitees is done by applying a waterproof coating over existing tile after cleaning and crack repair, without lifting any pieces. This solution suits the villas and residential buildings in this coastal area.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees has mostly newer villas and residential buildings with flat roofs, and its proximity to the Gulf means high humidity and salinity that affect the cement bed and tile. We start with deep cleaning to remove salt, algae and dust, then inspect the joints between tiles for any potential leaks. Fine cracks are filled with flexible filler that withstands the thermal expansion and contraction between day and night, then we apply the waterproof coating in even layers.

Funaitees is in Mubarak Al-Kabeer governorate, a district close to the Gulf with relatively modern buildings.

High coastal humidity requires the bed to be free of standing water before any waterproof coating is applied.

Back to Over-tile waterproofing

See also: Roof waterproofing in Funaitees

What the service covers - Over-tile waterproofing

What the service covers

Cleaning, crack repair and a waterproof coating applied directly over the existing tiled surface

  • Surface cleaning

    Removing dirt, algae and loose material before any coating is applied

  • Crack and joint sealing

    Filling tile cracks and grout lines with a flexible waterproof filler

  • Flexible waterproof coat

    Applying a flexible coating that moves with tiles under Kuwait's thermal cycling

  • Parapet edge treatment

    Reinforcing the junction between tiles and parapet walls against water entry

  • Drain collar bonding

    Bonding the coating tightly around each drain collar, the most common leak point

  • Post-application check

    Reviewing full coverage and marking any spots needing an extra pass

How it works.

  1. Call or whatsApp

    Describe the leak or problem and give your property location in Kuwait

  2. Roof inspection

    We inspect tiles, grout lines and drain positions to define the scope

  3. Preparation and cleaning

    Surface is cleaned, cracked tiles repaired and open joints filled

  4. Coating application

    Flexible waterproof coats applied across the field, edges and drain collars

  5. Check and handover

    Full coverage reviewed and handover completed once all points are confirmed sealed

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Over-tile waterproofing in Funaitees

Call now
Does coastal salinity affect how well the roof waterproofing works?

Yes, salt builds up on the surface and weakens adhesion. We use specialised chemical cleaning to remove salts before applying the waterproof coating.

What is the difference between rigid and flexible filler for sealing cracks?

Flexible filler moves with tile expansion and contraction from temperature changes, while rigid filler can crack. We choose flexible because coastal roofs experience significant thermal swings.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works