Over-tile waterproofing in Kuwait - Salhiya

Over-tile waterproofing in Salhiya

Waterproofing tiled roofs in Salhiya preserves the existing tiles without removal. We clean the surface, repair cracks, then apply a waterproof coating directly over the tiles.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Salhiya roofs feature old ceramic and stone tiling on mixed commercial and residential buildings. Most suffer minor cracks and light seepage, particularly at expansion joints and corners. Sealing without tile removal suits these conditions, saving time and expense versus full retiling. We focus on cleaning the surface from dust, salts and algae before applying the waterproof coating.

Salhiya is in Capital governorate, a commercial and residential area near Salhiya Commercial Complex and numerous administrative offices.

Waterproofing old tiled surfaces requires initial mechanical cleaning to remove salts and algae before any coating application.

Back to Over-tile waterproofing

See also: Roof waterproofing in Salhiya

What the service covers - Over-tile waterproofing

What the service covers

Cleaning, crack repair and a waterproof coating applied directly over the existing tiled surface

  • Surface cleaning

    Removing dirt, algae and loose material before any coating is applied

  • Crack and joint sealing

    Filling tile cracks and grout lines with a flexible waterproof filler

  • Flexible waterproof coat

    Applying a flexible coating that moves with tiles under Kuwait's thermal cycling

  • Parapet edge treatment

    Reinforcing the junction between tiles and parapet walls against water entry

  • Drain collar bonding

    Bonding the coating tightly around each drain collar, the most common leak point

  • Post-application check

    Reviewing full coverage and marking any spots needing an extra pass

How it works.

  1. Call or whatsApp

    Describe the leak or problem and give your property location in Kuwait

  2. Roof inspection

    We inspect tiles, grout lines and drain positions to define the scope

  3. Preparation and cleaning

    Surface is cleaned, cracked tiles repaired and open joints filled

  4. Coating application

    Flexible waterproof coats applied across the field, edges and drain collars

  5. Check and handover

    Full coverage reviewed and handover completed once all points are confirmed sealed

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Over-tile waterproofing in Salhiya

Call now
Can an old tiled roof be sealed without breaking it and retiling?

Yes, we clean the tiles and repair existing cracks, then apply a waterproof coating directly to the surface. This preserves the existing tiles and extends their lifespan.

How long does sealing a tiled roof without tile removal take?

Duration depends on roof area and crack count. Cleaning and prep takes two to three days, then the waterproof coating is applied in stages based on the coating type.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works