Over-tile waterproofing in Kuwait - Sharq

Over-tile waterproofing in Sharq

Over-tile waterproofing in Sharq preserves the existing roof surface while stopping water ingress. We clean cracks and debris, then apply a flexible waterproof coating directly over the old tiles.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sharq's residential, commercial and mixed-use buildings typically have old tile roofs 3 to 5 centimetres thick, and removing old tile costs extra time and effort. Instead, we clean the entire surface, repair cracks and voids under the tiles with flexible filler, then apply a high-adhesion waterproof coating over the full area. This approach reduces added weight on the structure and extends the life of the existing roof.

Sharq lies in Capital governorate near Kuwait Towers, a mixed district of residential buildings, office blocks and hotels.

Old tile on Sharq roofs typically sits on a solid cement bed at least 10 centimetres thick beneath the tiles themselves.

Back to Over-tile waterproofing

See also: Roof waterproofing in Sharq

What the service covers - Over-tile waterproofing

What the service covers

Cleaning, crack repair and a waterproof coating applied directly over the existing tiled surface

  • Surface cleaning

    Removing dirt, algae and loose material before any coating is applied

  • Crack and joint sealing

    Filling tile cracks and grout lines with a flexible waterproof filler

  • Flexible waterproof coat

    Applying a flexible coating that moves with tiles under Kuwait's thermal cycling

  • Parapet edge treatment

    Reinforcing the junction between tiles and parapet walls against water entry

  • Drain collar bonding

    Bonding the coating tightly around each drain collar, the most common leak point

  • Post-application check

    Reviewing full coverage and marking any spots needing an extra pass

How it works.

  1. Call or whatsApp

    Describe the leak or problem and give your property location in Kuwait

  2. Roof inspection

    We inspect tiles, grout lines and drain positions to define the scope

  3. Preparation and cleaning

    Surface is cleaned, cracked tiles repaired and open joints filled

  4. Coating application

    Flexible waterproof coats applied across the field, edges and drain collars

  5. Check and handover

    Full coverage reviewed and handover completed once all points are confirmed sealed

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Over-tile waterproofing in Sharq

Call now
Must we remove the old tile before waterproofing?

No, this type of waterproofing is applied directly to the existing surface after cleaning and repair. We remove debris, dust and salt deposits, fill any deep cracks with flexible filler, then apply the waterproof coating.

How long does over-tile waterproofing take?

Duration depends on roof area and condition. Cleaning, repair and first application typically happen in one session, with additional coats drying between applications according to material specifications.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works