Over-tile waterproofing in Kuwait - Sabah Al-Nasser

Over-tile waterproofing in Sabah Al-Nasser

Waterproofing Sabah Al-Nasser district roofs with direct coating over existing tile. Deep cleaning and application of flexible sealant that handles structural movement and thermal expansion.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sabah Al-Nasser residential roofs vary in age, from cooperative apartment blocks built in the 1980s to relatively newer villas. Old tile shows cracks from minor foundation settlement and seasonal expansion. Removing tile requires emptying the home and re-levelling, impractical for families. We choose over-tile sealing with thorough cleaning to remove accumulated salts and dirt, fill cracks with movement-tolerant sealant, then apply waterproof coating in multiple layers.

Sabah Al-Nasser district is in Farwaniya governorate near Sixth Ring Road, home to residential buildings of varied ages and sizes.

Cracks in Sabah Al-Nasser roofs typically come from minor foundation settlement and seasonal thermal expansion exceeding 10 millimetres per year.

Back to Over-tile waterproofing

See also: Roof waterproofing in Sabah Al-Nasser

What the service covers - Over-tile waterproofing

What the service covers

Cleaning, crack repair and a waterproof coating applied directly over the existing tiled surface

  • Surface cleaning

    Removing dirt, algae and loose material before any coating is applied

  • Crack and joint sealing

    Filling tile cracks and grout lines with a flexible waterproof filler

  • Flexible waterproof coat

    Applying a flexible coating that moves with tiles under Kuwait's thermal cycling

  • Parapet edge treatment

    Reinforcing the junction between tiles and parapet walls against water entry

  • Drain collar bonding

    Bonding the coating tightly around each drain collar, the most common leak point

  • Post-application check

    Reviewing full coverage and marking any spots needing an extra pass

How it works.

  1. Call or whatsApp

    Describe the leak or problem and give your property location in Kuwait

  2. Roof inspection

    We inspect tiles, grout lines and drain positions to define the scope

  3. Preparation and cleaning

    Surface is cleaned, cracked tiles repaired and open joints filled

  4. Coating application

    Flexible waterproof coats applied across the field, edges and drain collars

  5. Check and handover

    Full coverage reviewed and handover completed once all points are confirmed sealed

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Over-tile waterproofing in Sabah Al-Nasser

Call now
Do fine cracks in the tile need sealing before waterproofing?

Yes, we seal all cracks with flexible sealant that tolerates seasonal expansion and contraction. This stops water seeping through fine gaps before the waterproof coating reaches them.

Can waterproofing be applied to old roofs with cracked tile?

Yes, that is the common case. We inspect the tile, clean it thoroughly, identify structural cracks and seal them before coating. Cracked tile stays in place as long as the underlying structure is sound.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works