

What the work covers
Preparation, sealing and waterproofing of every internal pool surface, edge and penetration

Surface preparation
Cleaning, drying and crack repair before any waterproofing coat is applied

Primary waterproofing coat
Flexible waterproofing membrane applied uniformly to floor and walls

Joint and crack filling
Expansion joints and hairline cracks filled with chlorine-resistant flexible compound

Plumbing penetrations
Precise sealing around pump inlets, drains and jet fittings in the shell

Waterline and steps
Dedicated treatment at the fluctuating waterline zone and step anchors

Water-pressure test
Pool filled and water level monitored to confirm the waterproofing holds
Signs your pool needs waterproofing
Daily water level drop
Water loss beyond normal evaporation points to an active leak through the shell
Wet ground around the pool
Damp soil or wet surrounding tiles indicate water escaping through the outer shell
Detaching internal tiles
Tiles lifting from pool walls mean the waterproofing or adhesive bed behind has failed
Concrete pitting or spalling
Pitting or flaking on the shell surface means chlorine and salts have reached the concrete
Common pool waterproofing mistakes
Waterproofing a damp shell
Applying membrane before the concrete is fully dry causes early delamination and leaks
Skipping penetration sealing
Leaving pump and drain penetrations unsealed is the most common source of pool leaks
Tiling without a membrane
Tiling directly onto bare concrete accelerates tile loss and structural deterioration
Single thin coat only
An under-thickness coat cannot withstand constant water pressure and heat-driven concrete movement
More in roof waterproofing.
What goes wrong with most finishing.
The finish is what you see every day, and its mistakes do not hide. These three are the most common.
01A rushed finish
The finish is what you live with every day. Rushing it shows in every corner.
02Four contractors for one finish
Tiling, gypsum, paint and aluminium crews who never talk to each other.
03After-care that never comes
Once you have the keys, it is hard to find anyone to come back and fix what shows up.
The solution?
Full finishing, and maintenance after it, from one licensed company.

A rushed finishTurnkey finishing
Marble, tiling, gypsum and paint from one company.

Four contractors for one finishOne company for every trade
No gaps between the tiler, the gypsum crew and the painter.

After-care that never comesRegular maintenance after handover
And finishing on instalments if you need it.
How it works.
Call or whatsApp
Contact us to describe the pool condition and book a site visit
Site inspection
Shell inspected to locate leaks, cracks and the repair scope needed
Shell preparation
Cleaning, drying, crack repair and tile removal where required
Waterproofing application
Waterproofing layers applied across all surfaces with joints and penetrations sealed
Testing and handover
Pool filled and water level monitored before final handover
What sets the price.
No fixed rate applies; the quote depends on several factors that vary with each pool
Get a quotePool size and surface area
Total floor and wall area directly determines the volume of waterproofing material needed
Existing shell condition
Deep cracks and failed tiles increase preparation and repair work before waterproofing starts
Waterproofing system type
Multi-layer flexible systems cost differently from rigid cementitious waterproofing coatings
Number of penetrations and details
More jets, inlets, steps and stairs add detailing complexity and increase cost
Old tile removal
When existing tiles must come off before waterproofing, demolition and disposal add cost
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
Pool waterproofing in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Kuwait Fire Force (safety requirements in finishing work)
Questions, answered.
Call nowCan the pool be waterproofed without removing the old tiles?
It depends on tile condition. Sound tiles with no hollow spots can sometimes be waterproofed over, but loose or hollow tiles must be removed first because they hide active leak points and prevent proper adhesion.
How do I tell whether my pool is losing water to a leak or just evaporation?
Place a bucket of water on the pool edge for 24 hours. If the pool level drops more than the bucket level, there is an active leak rather than evaporation alone.
Are pool waterproofing materials different from roof waterproofing materials?
Yes. Pool waterproofing must withstand constant water contact, chlorine chemicals and hydrostatic pressure. Roof materials resist rain and UV but are not formulated for permanent immersion.
When can tiling start after the waterproofing is applied?
The waterproofing coat must cure fully and pass a water test before any tiling begins. Tiling over an incompletely cured membrane weakens bond strength and compromises the waterproofing.
Does the salt air near Kuwait's coastline affect outdoor pool waterproofing?
Yes. Salt-laden humidity accelerates concrete and metal corrosion. Outdoor pools in coastal areas need waterproofing materials with strong resistance to salt penetration and chemical exposure.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps






