Pool waterproofing in Kuwait - Mubarak Al-Abdullah

Pool waterproofing in Mubarak Al-Abdullah

Pool waterproofing in Mubarak Al-Abdullah focuses on residential villas with private pools. We prepare the entire interior surface, clean and smooth the concrete, then apply waterproof layers to the pool walls, floor and edges.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most villas in Mubarak Al-Abdullah have pools 1.5 to 2 metres deep dug into clayey and sandy soil. The pool walls and floor are reinforced concrete requiring repair of any cracks or seepage before waterproofing starts. Water loss from the pool affects the villa's foundations, so the surface must be inspected carefully and waterproof materials applied at uniform thickness.

Mubarak Al-Abdullah lies in Hawalli governorate, a residential suburb of villas with private pools requiring precise waterproofing.

Most villa pools in the area are 1.5 to 2 metres deep and require waterproof layers at least 3 mm thick for full protection.

Back to Pool waterproofing

See also: Roof waterproofing in Mubarak Al-Abdullah

What the work covers - Pool waterproofing

What the work covers

Preparation, sealing and waterproofing of every internal pool surface, edge and penetration

  • Surface preparation

    Cleaning, drying and crack repair before any waterproofing coat is applied

  • Primary waterproofing coat

    Flexible waterproofing membrane applied uniformly to floor and walls

  • Joint and crack filling

    Expansion joints and hairline cracks filled with chlorine-resistant flexible compound

  • Plumbing penetrations

    Precise sealing around pump inlets, drains and jet fittings in the shell

  • Waterline and steps

    Dedicated treatment at the fluctuating waterline zone and step anchors

  • Water-pressure test

    Pool filled and water level monitored to confirm the waterproofing holds

How it works.

  1. Call or whatsApp

    Contact us to describe the pool condition and book a site visit

  2. Site inspection

    Shell inspected to locate leaks, cracks and the repair scope needed

  3. Shell preparation

    Cleaning, drying, crack repair and tile removal where required

  4. Waterproofing application

    Waterproofing layers applied across all surfaces with joints and penetrations sealed

  5. Testing and handover

    Pool filled and water level monitored before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Pool waterproofing in Mubarak Al-Abdullah

Call now
How do you detect pool water leaks before applying the waterproof layer?

We fill the pool partially and monitor the water level over 24 hours to detect abnormal drops. Then we inspect all cracks and weak points under low water pressure before beginning waterproofing.

Do you repair existing cracks in the pool walls and floor?

Yes, we use flexible cement filler to seal fine cracks and repair minor seepage. For deep cracks, we apply a primer layer before final waterproofing to ensure tight adhesion.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works