
Pool waterproofing in Abu Hasaniya
Abu Hasaniya villas with waterfront exposure feature private pools on concrete bases facing high moisture and saline effects. We waterproof every internal pool surface with specialized layers to stop leaks and protect the building.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most Abu Hasaniya villas sit on large plots close to the sea, with pools dug 1.5 to 2 metres deep in sandy coastal soil that may be wet. The concrete pool bases face groundwater pressure and side seepage from surrounding soil, especially in winter. We clean the pit floor and walls of mud and debris, then apply a flexible waterproof layer that resists lateral pressure, paying special attention to pool corners and wall-to-floor junctions where leaks concentrate.
Abu Hasaniya lies in Mubarak Al-Kabeer governorate, a district of large residential villas on spacious plots near the sea.
We check the groundwater level before waterproofing to choose the correct layer thickness.

What the work covers
Preparation, sealing and waterproofing of every internal pool surface, edge and penetration

Surface preparation
Cleaning, drying and crack repair before any waterproofing coat is applied

Primary waterproofing coat
Flexible waterproofing membrane applied uniformly to floor and walls

Joint and crack filling
Expansion joints and hairline cracks filled with chlorine-resistant flexible compound

Plumbing penetrations
Precise sealing around pump inlets, drains and jet fittings in the shell

Waterline and steps
Dedicated treatment at the fluctuating waterline zone and step anchors

Water-pressure test
Pool filled and water level monitored to confirm the waterproofing holds
How it works.
Call or whatsApp
Contact us to describe the pool condition and book a site visit
Site inspection
Shell inspected to locate leaks, cracks and the repair scope needed
Shell preparation
Cleaning, drying, crack repair and tile removal where required
Waterproofing application
Waterproofing layers applied across all surfaces with joints and penetrations sealed
Testing and handover
Pool filled and water level monitored before final handover
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Pool waterproofing
Other services in Abu Hasaniya
Questions about Pool waterproofing in Abu Hasaniya
Call nowDoes groundwater affect pool waterproofing?
Very much so. Upward pressure pushes water through fine cracks in the floor. We apply thick, flexible waterproofing that withstands lateral and vertical pressure, and we monitor groundwater level before work starts.
How often should pool waterproofing be inspected after installation?
We perform a full inspection two weeks after filling to confirm no leaks have occurred. After that, annual routine monitoring is sufficient to ensure the waterproofing remains in good condition.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps