Pool waterproofing in Kuwait - Ardhiya Industrial

Pool waterproofing in Ardhiya Industrial

Pool waterproofing for industrial facilities in Ardhiya focuses on work efficiency and durability under heavy use. We carefully prepare internal surfaces and apply robust waterproof coatings to withstand continuous water and chemical exposure.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Ardhiya Industrial has factories and workshops with pools used for equipment cooling or industrial processes, often containing non-standard water with metals or other substances. The concrete in these pools faces greater seepage and corrosion pressure on reinforcement than residential pools. We select waterproof materials suited to continuous moisture and chemical exposure, and ensure full surface preparation before sealing to prevent coating failure later.

Ardhiya Industrial sits in Farwaniya governorate, a district of factories and workshops on large plots away from residential areas.

Ardhiya factory pools require periodic inspection after initial waterproofing to confirm the coating is not degraded by chemicals in use.

Back to Pool waterproofing

See also: Roof waterproofing in Ardhiya Industrial

What the work covers - Pool waterproofing

What the work covers

Preparation, sealing and waterproofing of every internal pool surface, edge and penetration

  • Surface preparation

    Cleaning, drying and crack repair before any waterproofing coat is applied

  • Primary waterproofing coat

    Flexible waterproofing membrane applied uniformly to floor and walls

  • Joint and crack filling

    Expansion joints and hairline cracks filled with chlorine-resistant flexible compound

  • Plumbing penetrations

    Precise sealing around pump inlets, drains and jet fittings in the shell

  • Waterline and steps

    Dedicated treatment at the fluctuating waterline zone and step anchors

  • Water-pressure test

    Pool filled and water level monitored to confirm the waterproofing holds

How it works.

  1. Call or whatsApp

    Contact us to describe the pool condition and book a site visit

  2. Site inspection

    Shell inspected to locate leaks, cracks and the repair scope needed

  3. Shell preparation

    Cleaning, drying, crack repair and tile removal where required

  4. Waterproofing application

    Waterproofing layers applied across all surfaces with joints and penetrations sealed

  5. Testing and handover

    Pool filled and water level monitored before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Pool waterproofing in Ardhiya Industrial

Call now
Can you waterproof an industrial pool with non-standard water?

Yes, we select waterproof materials resistant to the chemicals and metals in the water, and inspect water quality first to choose the best sealing system.

How often should factory pool waterproofing be inspected?

We recommend inspection every six months to confirm no cracks or chemical damage has occurred, with minor repairs made as needed.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works