Pool waterproofing in Kuwait - Sabah Al-Nasser

Pool waterproofing in Sabah Al-Nasser

Pool waterproofing in Sabah Al-Nasser covers concrete shells in large co-operative residential projects. We achieve complete sealing from floor to top edges to prevent leaks and ensure long-term protection.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sabah Al-Nasser comprises large co-operative residential projects with detached and semi-detached villas on spacious plots. Pools here are medium to large, 6 to 12 metres long and typically 1.8 metres deep, often in thick concrete shells. The relatively dry sandy soil provides better conditions than coastal areas, but direct sun exposure causes seasonal expansion and contraction in the concrete. We apply flexible waterproofing that tolerates thermal movement and leave an expansion joint at the top edges.

Sabah Al-Nasser sits in Farwaniya governorate near the Sixth Ring Road, a large co-operative residential district.

Co-operative pools in Sabah Al-Nasser require expansion joints at top edges to absorb seasonal concrete movement.

Back to Pool waterproofing

See also: Roof waterproofing in Sabah Al-Nasser

What the work covers - Pool waterproofing

What the work covers

Preparation, sealing and waterproofing of every internal pool surface, edge and penetration

  • Surface preparation

    Cleaning, drying and crack repair before any waterproofing coat is applied

  • Primary waterproofing coat

    Flexible waterproofing membrane applied uniformly to floor and walls

  • Joint and crack filling

    Expansion joints and hairline cracks filled with chlorine-resistant flexible compound

  • Plumbing penetrations

    Precise sealing around pump inlets, drains and jet fittings in the shell

  • Waterline and steps

    Dedicated treatment at the fluctuating waterline zone and step anchors

  • Water-pressure test

    Pool filled and water level monitored to confirm the waterproofing holds

How it works.

  1. Call or whatsApp

    Contact us to describe the pool condition and book a site visit

  2. Site inspection

    Shell inspected to locate leaks, cracks and the repair scope needed

  3. Shell preparation

    Cleaning, drying, crack repair and tile removal where required

  4. Waterproofing application

    Waterproofing layers applied across all surfaces with joints and penetrations sealed

  5. Testing and handover

    Pool filled and water level monitored before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Pool waterproofing in Sabah Al-Nasser

Call now
How do you handle concrete cracks from seasonal expansion and contraction?

We fill all cracks with flexible waterproofing compounds before final application, then leave expansion joints at pool edges to absorb movement without tearing the protective layers.

Can a pool with leaks after years of use be repaired?

Yes, we remove the damaged coating, locate the leak source, fill cracks and penetrations, then apply fresh waterproofing layers over all internal surfaces.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works