

What the installation covers
Complete fitting from frame anchoring to final watertightness check

Frame anchoring
Aluminium frame set plumb and level with chemical anchors into tile

Drain connection
Tray outlet connected to drain with correct fall, no pooling

Supply line connection
Hot and cold lines connected to the in-wall shower mixer

Glass panel fitting
Tempered glass panels seated in frame clips with compression gaskets

Silicone sealing
Neutral-cure sanitary silicone at every glass, tile and frame junction

Operational test
Water run, mixer, head and drain checked before handover
Materials and methods used
Chemical anchors for the frame
Bond frame to tiled wall without cracking tile, resisting repeated door swing load
Toughened safety glass
Shatters into blunt granules if broken, handles Kuwait temperature swings without stress cracking
Neutral-cure sanitary silicone
Releases no acetic acid that corrodes aluminium, stays flexible under moisture-driven wall movement
Acrylic or solid-surface tray
Light weight, resists summer thermal expansion cracking, set on proper support framework
Before you call us
Measure the available space
Note clear width, depth and height between walls before buying the unit
Locate the existing drain
Floor drain position and offset affect which tray model can be used
Check the wall construction
Block walls take chemical anchors; plasterboard needs a backing plate first
Confirm mixer rough-in exists
Hot and cold supply elbows should already exit the wall at the correct height
More in sanitary fixture installation.
What goes wrong with most plumbing.
Plumbing problems start hidden and end with breaking tiles. These three cost the most.
01Pipes laid in a rush
Pipework rushed before the walls close stays hidden until it starts to leak.
02Leaks you cannot see
A slow leak behind tiles shows up as damp, stains and a higher water bill.
03Nobody answers in an emergency
A burst pipe at night cannot wait for a contractor who has moved on.
The solution?
Pipework, leak detection and maintenance from one licensed company.

Pipes laid in a rushFirst-fix plumbing by the builder
Laid as part of the build, before the walls close.

Leaks you cannot seeWater leak detection
We find the source first.

Nobody answers in an emergency24-hour emergency plumber
Plus regular maintenance contracts after handover.
How it works.
Call or whatsApp
Describe the space dimensions and cabin model you have or plan to buy
Site survey
Technician checks drain location, supply lines and wall construction
Quote and confirm
Fixed quote issued after survey, installation date agreed
Installation
Frame, glass, drain and supply fitted, all joints silicone-sealed
Test and handover
Full water run and leak check done before final handover
What sets the price.
Quote varies with cabin size, drain condition and whether supply rough-in is already in place
Get a quoteCabin size and shape
Large or corner cabins take longer to align and anchor securely
Drain line condition
Adjusting drain position or re-sloping adds labour and minor breaking works
Supply rough-in availability
Missing in-wall supply elbows require additional plumbing inside the wall
Glass type and thickness
Heavier or thicker glass affects anchoring method and installation time
Breaking and reinstatement
Partial tile breaking to adjust the drain outlet is priced separately
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
Shower cabin installation in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Ministry of Electricity and Water (water and drainage connections)
Questions, answered.
Call nowCan a shower cabin be installed directly onto an existing tiled floor without a tray?
Yes, a flush-floor cabin is possible if the existing drain sits at the right level and the floor has enough fall. If the drain is too high or the tile slope is wrong, minor floor works are needed first.
What happens if the silicone around the frame cracks or detaches after a while?
Cracked silicone lets water behind the tiles, causing hidden wall damp that shows late. The old bead must be fully removed and the surface cleaned before applying a fresh run, not simply painted over.
Does Kuwait's hard water affect the shower mixer or head inside the cabin?
Yes, mineral scale blocks shower head nozzles and stiffens mixer handles over time. Regular soaking of the head in a descaling solution keeps flow even and protects internal mixer seals.
Can the cabin be fitted in an older bathroom without replacing the existing tiles?
Usually yes, provided the existing tiles are firmly bonded and the wall behind is solid enough for anchors. Hollow or loose tiles need attention before the frame can be fixed.
How long does fitting a shower cabin normally take?
When the drain and supply lines are already in place, installation is completed in a single visit. Drain adjustments or supply rough-in work can add a second day.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps







