Shower cabin installation in Kuwait - Anjafa

Shower cabin installation in Anjafa

Shower cabin installation in Anjafa covers villas and mid-rise residential buildings. We anchor the frame to load-bearing walls, slope the drainage correctly, and seal every joint to prevent water infiltration into adjacent walls.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa has two- or three-storey villas and four- to six-storey apartment buildings, mostly built in the 1980s and 1990s. Bathrooms in these structures are usually compact, bounded by load-bearing walls, so the cabin size must be measured precisely against existing drain and supply pipes. Frame anchoring relies on bolts into existing tile or concrete, with full sealing of all gaps using silicone sealant and water barrier.

Anjafa lies in Hawalli governorate, a relatively older residential district of villas and medium-rise apartment buildings.

Most bathrooms in Anjafa villas and apartments require removal of the old cabin and patching openings before the new frame is installed.

Back to Shower cabin installation

See also: Sanitary fixture installation in Anjafa

What the installation covers - Shower cabin installation

What the installation covers

Complete fitting from frame anchoring to final watertightness check

  • Frame anchoring

    Aluminium frame set plumb and level with chemical anchors into tile

  • Drain connection

    Tray outlet connected to drain with correct fall, no pooling

  • Supply line connection

    Hot and cold lines connected to the in-wall shower mixer

  • Glass panel fitting

    Tempered glass panels seated in frame clips with compression gaskets

  • Silicone sealing

    Neutral-cure sanitary silicone at every glass, tile and frame junction

  • Operational test

    Water run, mixer, head and drain checked before handover

How it works.

  1. Call or whatsApp

    Describe the space dimensions and cabin model you have or plan to buy

  2. Site survey

    Technician checks drain location, supply lines and wall construction

  3. Quote and confirm

    Fixed quote issued after survey, installation date agreed

  4. Installation

    Frame, glass, drain and supply fitted, all joints silicone-sealed

  5. Test and handover

    Full water run and leak check done before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Shower cabin installation in Anjafa

Call now
Can a shower cabin be fitted in an old bathroom without breaking walls?

Yes, if the concrete walls are sound and the spacing is right. We remove the old cabin, clean the area, and bolt the new frame directly without extra cutting.

How deep must the tile be to anchor the frame bolts safely?

Tile must be at least 1.5 cm thick, or we penetrate through to the concrete below using expansion anchors. We verify existing pipe locations before any drilling.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works