Shower cabin installation in Kuwait - Funaitees

Shower cabin installation in Funaitees

Shower cabin installation in Funaitees involves anchoring the metal frame precisely to solid concrete walls with full waterproofing from below and sides. We test seal integrity before delivery to ensure no water penetrates adjacent areas.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees areas include mid-rise apartment buildings and older villas, often with cramped bathrooms and legacy drainage pipes from previous renovations. Older construction sometimes means uneven walls and weak foundations below bathroom floor level, so we use flexible waterproofing compounds and movable sealants where the cabin meets the wall. We verify the existing drain location and reroute if needed, rechecking every joint before final fixing.

Funaitees is in Mubarak Al-Kabeer governorate, an urban residential district.

Most older bathrooms in Funaitees need rerouting of the existing drain before the new cabin goes in.

Back to Shower cabin installation

See also: Sanitary fixture installation in Funaitees

What the installation covers - Shower cabin installation

What the installation covers

Complete fitting from frame anchoring to final watertightness check

  • Frame anchoring

    Aluminium frame set plumb and level with chemical anchors into tile

  • Drain connection

    Tray outlet connected to drain with correct fall, no pooling

  • Supply line connection

    Hot and cold lines connected to the in-wall shower mixer

  • Glass panel fitting

    Tempered glass panels seated in frame clips with compression gaskets

  • Silicone sealing

    Neutral-cure sanitary silicone at every glass, tile and frame junction

  • Operational test

    Water run, mixer, head and drain checked before handover

How it works.

  1. Call or whatsApp

    Describe the space dimensions and cabin model you have or plan to buy

  2. Site survey

    Technician checks drain location, supply lines and wall construction

  3. Quote and confirm

    Fixed quote issued after survey, installation date agreed

  4. Installation

    Frame, glass, drain and supply fitted, all joints silicone-sealed

  5. Test and handover

    Full water run and leak check done before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Shower cabin installation in Funaitees

Call now
What do you do if the bathroom walls are uneven and old?

We use flexible waterproof compounds and flexible sealants at corners and junctions to accommodate wall irregularities, with thorough inspection before final fixing.

How do you handle old drain pipes in renovated homes?

We first check the existing drain location and condition, then reroute or replace it if needed to ensure proper slope beneath the new cabin.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works