What the first-fix covers
Drain branches, floor outlets, stacks and sewer connection points laid before walls and floors close.

Horizontal drain runs
uPVC pipes set to calculated falls to prevent silt build-up and blockages.

Wet-room drain branches
WC, basin and shower branches sized correctly for each fixture type.

Floor drain outlets
Floor drain stubs set flush to final screed level before pouring.

Vent stacks
Vent pipes prevent negative pressure and sewer gas from entering the building.

Cleanout access points
Cleanout fittings placed at every major change of direction for future maintenance.

Public sewer connection
Main drain tied into the manhole and public municipal sewer network.
Mistakes that cause drain failures
Insufficient pipe fall
A fall below the required gradient lets fine sand and grease settle until the line blocks.
Undersized WC branch
A narrow WC drain blocks repeatedly and cannot be upsized without breaking finished floors.
No vent pipe installed
Without venting, trap seals are pulled dry and sewer gas enters the building.
Screed poured before inspection
Closing pipes before checking falls traps errors that are very costly to fix later.
What to have ready before you call
Approved architectural drawings
Approved drawings show wet-room positions and the external sewer exit point.
Current build stage
Confirm whether slabs are poured and whether any screed has already been cast.
Fixture list per room
WC, basin and shower counts per floor determine required pipe sizes and falls.
Manhole location
Knowing the nearest municipal manhole lets us plan the main drain route correctly.
More in first-fix plumbing, new houses.
What goes wrong with most plumbing.
Plumbing problems start hidden and end with breaking tiles. These three cost the most.
01Pipes laid in a rush
Pipework rushed before the walls close stays hidden until it starts to leak.
02Leaks you cannot see
A slow leak behind tiles shows up as damp, stains and a higher water bill.
03Nobody answers in an emergency
A burst pipe at night cannot wait for a contractor who has moved on.
The solution?
Pipework, leak detection and maintenance from one licensed company.

Pipes laid in a rushFirst-fix plumbing by the builder
Laid as part of the build, before the walls close.

Leaks you cannot seeWater leak detection
We find the source first.

Nobody answers in an emergency24-hour emergency plumber
Plus regular maintenance contracts after handover.
How it works.
First contact
Call or WhatsApp us and share any available drawings.
Site visit
We visit, check build stage and assess possible drain routing paths.
Quote and layout
We provide a quote with a drain route plan showing pipe falls.
Installation
Trenches are dug, pipes laid with correct fall and cleanouts fixed before screed.
Check and handover
Flow is tested and pipe routes are recorded before the screed is poured.
What sets the price.
No fixed price list applies; these factors decide the quote for each project.
Get a quoteDrain outlet count
Each WC, basin and floor drain point adds to overall work scope.
Floor count and built area
Multiple floors require longer vertical stacks and more branch connections.
Main drain run length
Distance from the farthest outlet to the municipal manhole affects pipe quantity.
Trenching and backfill
Trench depth and ground conditions affect excavation time and backfill cost.
Pipe specification
Choosing between uPVC diameter classes and wall thicknesses affects material cost.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
First-fix drainage in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Ministry of Electricity and Water (water and drainage connections)
Questions, answered.
Call nowWhat is the correct fall for a horizontal drain pipe in a new house?
A horizontal drain typically falls at 1 to 2 percent, meaning 1 to 2 centimetres drop per metre of run. A lower gradient allows Kuwait's fine sand to settle and block the line. A steeper fall lets water run ahead of solids, which then settle and cause blockages too.
Can a drain stub position be moved after the floor screed has been poured?
No. Drain stub positions must be confirmed before the screed is poured. Moving one afterwards means breaking the floor, re-laying the pipe and backfilling again, which is costly and delays finishing works.
Why are 45-degree swept fittings used in drainage instead of square elbows?
Swept fittings allow solids to travel through direction changes without building up. A square elbow acts as a ledge where grease and sand collect, eventually blocking the line.
How does first-fix drainage differ in a multi-storey villa compared to a single-floor house?
A multi-storey building needs vertical stacks that collect branches from each floor and carry them to the ground-level drain, with a vent for each stack. A single-floor house relies mainly on horizontal buried runs below the ground-floor screed.
Does first-fix drainage include connecting the line to the public sewer network?
Yes. The work includes running the main drain from the building out to the municipal inspection manhole and confirming a sound connection to the public sewer network.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps