First-fix drainage in Funaitees
First-fix drain lines in Funaitees serve multi-storey apartment blocks with long horizontal runs from upper units to vertical stacks. We lay pipes and floor outlets before screed and walls, respecting required fall and safe bends around structural columns.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Funaitees buildings are mostly mid to high-rise apartments on compressed plots, with consecutive units per floor and multiple bathrooms per dwelling. That means long horizontal drain branches from the furthest units toward vertical stacks running down the columns, with precise slope calculations over runs up to 15 metres. The tight plots limit pipe distribution space, so we avoid unnecessary crossings with water and electrical lines, and follow the approved structural drawings before laying any pipe.
Funaitees sits in Mubarak Al-Kabeer governorate, a district of closely built apartment blocks near the governorate's boundary.
Horizontal drain branches in Funaitees apartment buildings are typically 75 mm per unit, with a minimum fall of 1 in 50 over long runs.

What the first-fix covers
Drain branches, floor outlets, stacks and sewer connection points laid before walls and floors close.

Horizontal drain runs
uPVC pipes set to calculated falls to prevent silt build-up and blockages.

Wet-room drain branches
WC, basin and shower branches sized correctly for each fixture type.

Floor drain outlets
Floor drain stubs set flush to final screed level before pouring.

Vent stacks
Vent pipes prevent negative pressure and sewer gas from entering the building.

Cleanout access points
Cleanout fittings placed at every major change of direction for future maintenance.

Public sewer connection
Main drain tied into the manhole and public municipal sewer network.
How it works.
First contact
Call or WhatsApp us and share any available drawings.
Site visit
We visit, check build stage and assess possible drain routing paths.
Quote and layout
We provide a quote with a drain route plan showing pipe falls.
Installation
Trenches are dug, pipes laid with correct fall and cleanouts fixed before screed.
Check and handover
Flow is tested and pipe routes are recorded before the screed is poured.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for First-fix drainage
Other services in Funaitees
Questions about First-fix drainage in Funaitees
Call nowHow do you run long drain branches from distant units to the main stack?
We calculate the fall over the entire run using precision levels, support branches on clips beneath the floors, and avoid traps and sharp bends that impede flow.
Can drain branches run above water pipes in the same corridor?
Complete separation is preferred, but if they must cross, drain pipes must pass above water lines with at least 15 cm clearance, with each pipe independently supported.
Licensed and registered in Kuwait.