
First-fix drainage in Hateen
First-fix drainage in Hateen requires laying drain branches at constant gradient and calibrated diameters before floors and walls are cast. We run drain pipes from floor outlets through stacks to municipal sewer connection points for correct functionality.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Hateen comprises multi-storey apartment blocks on regular plots, with units typically designed for 3 to 4 bathrooms and a kitchen sink per apartment. Correct drain layout in these buildings means setting separate branches from each bathroom and kitchen to the vertical stack without cross-overs, and ensuring a minimum 1-in-100 gradient for effective flow. Pipe diameter selection starts at 75 mm for simple branches and 100 mm for main stacks, and we coordinate with the builder to reserve adequate space below floor slabs before pouring.
Hateen is in Hawalli governorate and comprises clusters of similarly designed residential apartment blocks.
The minimum gradient for horizontal drain branches is 1 in 100 to ensure effective discharge without blockage.

What the first-fix covers
Drain branches, floor outlets, stacks and sewer connection points laid before walls and floors close.

Horizontal drain runs
uPVC pipes set to calculated falls to prevent silt build-up and blockages.

Wet-room drain branches
WC, basin and shower branches sized correctly for each fixture type.

Floor drain outlets
Floor drain stubs set flush to final screed level before pouring.

Vent stacks
Vent pipes prevent negative pressure and sewer gas from entering the building.

Cleanout access points
Cleanout fittings placed at every major change of direction for future maintenance.

Public sewer connection
Main drain tied into the manhole and public municipal sewer network.
How it works.
First contact
Call or WhatsApp us and share any available drawings.
Site visit
We visit, check build stage and assess possible drain routing paths.
Quote and layout
We provide a quote with a drain route plan showing pipe falls.
Installation
Trenches are dug, pipes laid with correct fall and cleanouts fixed before screed.
Check and handover
Flow is tested and pipe routes are recorded before the screed is poured.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for First-fix drainage
Other services in Hateen
Questions about First-fix drainage in Hateen
Call nowHow are multiple bathroom drains handled in the same apartment unit?
We set a separate drain branch from each bathroom to the main vertical stack, maintaining the required gradient and complete separation to prevent cross-interference between outlets.
When is drainage tested before the floor slab is poured?
We perform a water test on each drain branch after all pipes are fixed and before concrete pouring begins, to confirm there are no leaks or deviations from the required gradients.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps