Drain-line first-fix in Ardhiya Industrial involves running branches for warehouses and industrial facilities with sections and slopes matched to expected load. We connect all floor outlets and wet areas to main drains before screed and final floor finishes.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Ardhiya Industrial is a district of warehouses, workshops and factories on large plots, mostly single or two-storey structures with wide roof spans and thick concrete floors. Drain branches need larger diameters and steady slopes because industrial floors carry heavy loads and drainage may include industrial washwater. We isolate drain pipes from paths subject to machine vibration or repeated loading, and clearly mark underground pipes to prevent puncture during future drilling.

Ardhiya Industrial sits in Farwaniya governorate, a district of industrial and storage facilities on wide plots.

Industrial drain pipes are laid with diameters no smaller than 110 mm for secondary branches and 160 mm for main stacks per municipality code.

Back to First-fix drainage

See also: First-fix plumbing, new houses in Ardhiya Industrial

What the first-fix covers - First-fix drainage

What the first-fix covers

Drain branches, floor outlets, stacks and sewer connection points laid before walls and floors close.

  • Horizontal drain runs

    uPVC pipes set to calculated falls to prevent silt build-up and blockages.

  • Wet-room drain branches

    WC, basin and shower branches sized correctly for each fixture type.

  • Floor drain outlets

    Floor drain stubs set flush to final screed level before pouring.

  • Vent stacks

    Vent pipes prevent negative pressure and sewer gas from entering the building.

  • Cleanout access points

    Cleanout fittings placed at every major change of direction for future maintenance.

  • Public sewer connection

    Main drain tied into the manhole and public municipal sewer network.

How it works.

  1. First contact

    Call or WhatsApp us and share any available drawings.

  2. Site visit

    We visit, check build stage and assess possible drain routing paths.

  3. Quote and layout

    We provide a quote with a drain route plan showing pipe falls.

  4. Installation

    Trenches are dug, pipes laid with correct fall and cleanouts fixed before screed.

  5. Check and handover

    Flow is tested and pipe routes are recorded before the screed is poured.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix drainage in Ardhiya Industrial

Call now
Do you handle industrial washwater drains from workshops and factories?

Yes, we run separate industrial drain branches with larger diameters and steady slopes, and review expected water types to choose the right pipe material, either PVC or HDPE.

How do you protect drain pipes under heavy industrial floors?

We set pipes in separate concrete beds at safe depth below the final floor level with warning markers, and route heavy loads to avoid direct contact with the pipes.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works