First-fix drainage in Hassawi
Drain-line first-fix in Hassawi involves laying branches at correct slopes and approved diameters before screeding in residential and mixed-use buildings. We connect bathroom and kitchen outlets to main drain stacks per approved designs and municipality requirements.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Hassawi is a residential and commercial district on medium to large plots, mostly four- to six-storey apartment buildings with mixed commercial and residential units. Drain branches from bathrooms, kitchens and laundries run horizontally toward the main drain stack on a clear plan drawn before work begins, and are secured in a safe path away from footings. The medium-sized plots require balance between branch density and spacing from other utilities, which needs careful planning before the screed pour.
Hassawi sits in Farwaniya governorate, a district of medium-rise residential and commercial apartment buildings.
We maintain a minimum 50 cm horizontal separation between drain pipes and fresh water lines below the floor slab.

What the first-fix covers
Drain branches, floor outlets, stacks and sewer connection points laid before walls and floors close.

Horizontal drain runs
uPVC pipes set to calculated falls to prevent silt build-up and blockages.

Wet-room drain branches
WC, basin and shower branches sized correctly for each fixture type.

Floor drain outlets
Floor drain stubs set flush to final screed level before pouring.

Vent stacks
Vent pipes prevent negative pressure and sewer gas from entering the building.

Cleanout access points
Cleanout fittings placed at every major change of direction for future maintenance.

Public sewer connection
Main drain tied into the manhole and public municipal sewer network.
How it works.
First contact
Call or WhatsApp us and share any available drawings.
Site visit
We visit, check build stage and assess possible drain routing paths.
Quote and layout
We provide a quote with a drain route plan showing pipe falls.
Installation
Trenches are dug, pipes laid with correct fall and cleanouts fixed before screed.
Check and handover
Flow is tested and pipe routes are recorded before the screed is poured.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for First-fix drainage
Other services in Hassawi
Questions about First-fix drainage in Hassawi
Call nowHow do you route laundry drain lines in apartment buildings?
We run separate laundry drain pipes from the washing machine outlet at 40 or 50 mm diameter with a safe slope to a nearby drain branch or directly to the main stack, coordinating the route with neighbouring units.
Do you install traps or separators at drain outlets before screeding?
Yes, we install P- or S-traps at every bathroom and kitchen outlet to prevent odours and insects, securing them to resist movement during the screed pour.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps