First-fix drainage in Kuwait - Sabahiya

First-fix drainage in Sabahiya

First-fix drainage in Sabahiya includes laying drain branches and floor outlets through vertical stacks before slab pouring and enclosure. We apply gradient and diameter standards to ensure reliable discharge.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sabahiya comprises villas and small apartment buildings on plots ranging from 300 to 600 square metres. Small villas typically have 1 to 2 bathrooms and one kitchen sink, while small apartment blocks contain 2 to 3 units with one bathroom per unit. Running drain branches in this pattern requires economical design of stacks and branches to avoid over-sizing, while maintaining gradient and diameter standards and health separation between drain and potable water sources.

Sabahiya is in Ahmadi governorate and is a residential area with varied plot sizes and building designs.

A single main stack diameter must be at least 100 mm to serve a maximum of 6 residential units.

Back to First-fix drainage

See also: First-fix plumbing, new houses in Sabahiya

What the first-fix covers - First-fix drainage

What the first-fix covers

Drain branches, floor outlets, stacks and sewer connection points laid before walls and floors close.

  • Horizontal drain runs

    uPVC pipes set to calculated falls to prevent silt build-up and blockages.

  • Wet-room drain branches

    WC, basin and shower branches sized correctly for each fixture type.

  • Floor drain outlets

    Floor drain stubs set flush to final screed level before pouring.

  • Vent stacks

    Vent pipes prevent negative pressure and sewer gas from entering the building.

  • Cleanout access points

    Cleanout fittings placed at every major change of direction for future maintenance.

  • Public sewer connection

    Main drain tied into the manhole and public municipal sewer network.

How it works.

  1. First contact

    Call or WhatsApp us and share any available drawings.

  2. Site visit

    We visit, check build stage and assess possible drain routing paths.

  3. Quote and layout

    We provide a quote with a drain route plan showing pipe falls.

  4. Installation

    Trenches are dug, pipes laid with correct fall and cleanouts fixed before screed.

  5. Check and handover

    Flow is tested and pipe routes are recorded before the screed is poured.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix drainage in Sabahiya

Call now
Can one main stack serve both a small villa and an adjacent small building?

Yes, if each unit has its own drain routing and the stack diameter is adequate for flow from both. We design this in coordination with the site engineer before pouring.

What if a small villa has only one bathroom?

We run a single branch from the bathroom to the main stack at a minimum 75 mm diameter and 1-in-100 gradient. Fewer bathrooms do not reduce gradient or diameter standards.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works