Drainage first-fix in Anjafa targets mid-rise apartment blocks on closely spaced plots with clay soil. We run drain lines at diameters and slopes suited to local soil and stacked sanitary loads, with complete separation from potable water routes.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa is a residential zone of 5, 7-storey blocks on tight plots with moisture-heavy clay soil. This means excavating drain trenches requires protection against soil collapse and seepage, plus monitoring groundwater levels. We use drain pipes from 100 mm on individual branches up to 200 mm or larger for the main stack collecting multiple floors. We ensure complete separation between drain and potable lines, maintaining at least 1.5 m horizontal and 60 cm vertical clearance.

Anjafa lies in Hawalli governorate, a residential district of adjacent apartment blocks on defined plots.

Main drain stacks in Anjafa typically start at 150 mm diameter minimum to handle multi-storey block loads.

Back to First-fix drainage

See also: First-fix plumbing, new houses in Anjafa

What the first-fix covers - First-fix drainage

What the first-fix covers

Drain branches, floor outlets, stacks and sewer connection points laid before walls and floors close.

  • Horizontal drain runs

    uPVC pipes set to calculated falls to prevent silt build-up and blockages.

  • Wet-room drain branches

    WC, basin and shower branches sized correctly for each fixture type.

  • Floor drain outlets

    Floor drain stubs set flush to final screed level before pouring.

  • Vent stacks

    Vent pipes prevent negative pressure and sewer gas from entering the building.

  • Cleanout access points

    Cleanout fittings placed at every major change of direction for future maintenance.

  • Public sewer connection

    Main drain tied into the manhole and public municipal sewer network.

How it works.

  1. First contact

    Call or WhatsApp us and share any available drawings.

  2. Site visit

    We visit, check build stage and assess possible drain routing paths.

  3. Quote and layout

    We provide a quote with a drain route plan showing pipe falls.

  4. Installation

    Trenches are dug, pipes laid with correct fall and cleanouts fixed before screed.

  5. Check and handover

    Flow is tested and pipe routes are recorded before the screed is poured.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix drainage in Anjafa

Call now
How do you protect drain trenches from wet clay soil collapse?

We use side bracing with timber or metal boards, monitor groundwater levels, and pump excess water before laying pipes. After testing each section, we backfill in controlled layers.

What is the safe distance between drain pipes and potable water lines on site?

Safe horizontal distance is at least 1.5 m, vertical is 60 cm. If pipes must run closer, we use a concrete barrier or raise one line to prevent contamination.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works