
First-fix drainage in Anjafa
Drainage first-fix in Anjafa targets mid-rise apartment blocks on closely spaced plots with clay soil. We run drain lines at diameters and slopes suited to local soil and stacked sanitary loads, with complete separation from potable water routes.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Anjafa is a residential zone of 5, 7-storey blocks on tight plots with moisture-heavy clay soil. This means excavating drain trenches requires protection against soil collapse and seepage, plus monitoring groundwater levels. We use drain pipes from 100 mm on individual branches up to 200 mm or larger for the main stack collecting multiple floors. We ensure complete separation between drain and potable lines, maintaining at least 1.5 m horizontal and 60 cm vertical clearance.
Anjafa lies in Hawalli governorate, a residential district of adjacent apartment blocks on defined plots.
Main drain stacks in Anjafa typically start at 150 mm diameter minimum to handle multi-storey block loads.

What the first-fix covers
Drain branches, floor outlets, stacks and sewer connection points laid before walls and floors close.

Horizontal drain runs
uPVC pipes set to calculated falls to prevent silt build-up and blockages.

Wet-room drain branches
WC, basin and shower branches sized correctly for each fixture type.

Floor drain outlets
Floor drain stubs set flush to final screed level before pouring.

Vent stacks
Vent pipes prevent negative pressure and sewer gas from entering the building.

Cleanout access points
Cleanout fittings placed at every major change of direction for future maintenance.

Public sewer connection
Main drain tied into the manhole and public municipal sewer network.
How it works.
First contact
Call or WhatsApp us and share any available drawings.
Site visit
We visit, check build stage and assess possible drain routing paths.
Quote and layout
We provide a quote with a drain route plan showing pipe falls.
Installation
Trenches are dug, pipes laid with correct fall and cleanouts fixed before screed.
Check and handover
Flow is tested and pipe routes are recorded before the screed is poured.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for First-fix drainage
Other services in Anjafa
Questions about First-fix drainage in Anjafa
Call nowHow do you protect drain trenches from wet clay soil collapse?
We use side bracing with timber or metal boards, monitor groundwater levels, and pump excess water before laying pipes. After testing each section, we backfill in controlled layers.
What is the safe distance between drain pipes and potable water lines on site?
Safe horizontal distance is at least 1.5 m, vertical is 60 cm. If pipes must run closer, we use a concrete barrier or raise one line to prevent contamination.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps