
Rooftop floor addition in Firdous
Adding a rooftop floor on a verified structure in Firdous begins with precise testing of the concrete roof and frame load capacity. We perform necessary tests and measurements, then build the new floor with proper structural connection to the original building.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Firdous is a relatively modern residential district with medium-rise houses and apartment blocks on regular plots, and most projects are built to contemporary building standards. However, each building has unique structural characteristics; some may need light reinforcement while others require more comprehensive intervention. We inspect the roof, columns and foundations separately for each project, using precise engineering calculations to determine the type and extent of reinforcement needed. The location near Sixth Ring Road means the ground is stable and administrative procedures are relatively straightforward.
Firdous is in Farwaniya governorate, a modern residential district near Firdous Co-op and Sixth Ring Road.
We verify the original building drawings match the actual structure before submitting reinforcement calculations to the municipality.

What the work covers
Structural check of the existing roof through to handover of the finished rooftop floor.

Existing roof assessment
Check slab thickness, column capacity and load margin before any work starts.

Drawings and permits
Prepare structural and architectural drawings and obtain the municipality building permit.

Rebar tie-in to columns
Core-drill column tops and epoxy-anchor starter bars for the new frame.

Concrete frame and walls
Pour new columns, beams and roof slab with reinforced block infill walls.

New roof insulation
Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

Full finishing
Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.
How it works.
First contact
Call or WhatsApp us to describe the house and current floor count.
Site visit
We visit to inspect the roof slab and columns and assess their load capacity.
Drawings and permit
We prepare structural and architectural drawings and handle the building permit.
Construction
Tie rebar to existing columns, pour frame and slab, raise walls and roof.
Finishing and handover
Complete all finishes on the new floor then hand over with final drawings.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Rooftop floor addition
Other services in Firdous
Questions about Rooftop floor addition in Firdous
Call nowIf the building is new and built to standards, does it still need reinforcement before adding a floor?
Yes, because adding a full floor significantly increases loads. Even modern buildings may need localized reinforcement of columns, roof or foundations. We determine this through testing and calculations.
How long do structural tests take before building starts?
Tests typically take several weeks, as some require sample extraction and lab analysis. We run these in parallel with drawing preparation and administrative approvals to minimize delay.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps