
Rooftop floor addition in Jleeb Al-Shuyoukh
Rooftop floor addition on verified structure in Jleeb Al-Shuyoukh requires careful testing because most buildings are relatively old and may need substantial reinforcement. We assess the existing roof and frame, then add the new floor with strong structural connection to the original building.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Jleeb Al-Shuyoukh is a densely populated residential district with buildings of varying ages and heights, many built in the 1970s and 1980s to standards that may not match current codes. Reinforcement in some buildings is weak or irregularly distributed. Before adding any floor, we take core samples from the roof and columns, and test the soil to understand bearing capacity. We may need to reinforce foundations with concrete injection or footing widening, and strengthen columns and roof by adding new beams and columns. High residential density means work requires close coordination with neighbours and local authorities.
Jleeb Al-Shuyoukh is in Farwaniya governorate, a densely populated residential district near Jleeb Al-Shuyoukh market.
We require written approval from the authorities for any structural modifications before starting reinforcement or pouring work in dense areas.

What the work covers
Structural check of the existing roof through to handover of the finished rooftop floor.

Existing roof assessment
Check slab thickness, column capacity and load margin before any work starts.

Drawings and permits
Prepare structural and architectural drawings and obtain the municipality building permit.

Rebar tie-in to columns
Core-drill column tops and epoxy-anchor starter bars for the new frame.

Concrete frame and walls
Pour new columns, beams and roof slab with reinforced block infill walls.

New roof insulation
Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

Full finishing
Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.
How it works.
First contact
Call or WhatsApp us to describe the house and current floor count.
Site visit
We visit to inspect the roof slab and columns and assess their load capacity.
Drawings and permit
We prepare structural and architectural drawings and handle the building permit.
Construction
Tie rebar to existing columns, pour frame and slab, raise walls and roof.
Finishing and handover
Complete all finishes on the new floor then hand over with final drawings.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Rooftop floor addition
Other services in Jleeb Al-Shuyoukh
Questions about Rooftop floor addition in Jleeb Al-Shuyoukh
Call nowCan you add a floor to an older building in a densely populated area?
Yes, but it requires comprehensive and precise assessment of the current structure, often involving extensive reinforcement. It also needs coordination with neighbours and authority approvals before work begins.
What if the current foundations are too weak to support the added floor?
We strengthen foundations using pressurized concrete injection or by widening existing footings with specialized formwork. This requires precise field work and additional municipality approvals.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps