
Rooftop floor addition in Hassawi
Rooftop floors in Hassawi are usually built on older residential structures, so we conduct detailed inspection of concrete quality and columns to assess their load-bearing capacity before pouring.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Hassawi has relatively older apartment buildings, mostly four to five storeys with concrete that may be cracked or weak. Before addition, we take samples from the roof slab and test them to confirm allowable stress. Old columns may not support a new floor without reinforcement, especially if foundations are shallow. We calculate the rising loads precisely and may add new columns alongside existing ones or strengthen them with steel wrapping and epoxy resin.
Hassawi sits in Farwaniya governorate, an older residential district with buildings dating back several decades.
Most columns in Hassawi buildings are 30 to 40 cm square reinforced concrete sections and require careful inspection before any addition.

What the work covers
Structural check of the existing roof through to handover of the finished rooftop floor.

Existing roof assessment
Check slab thickness, column capacity and load margin before any work starts.

Drawings and permits
Prepare structural and architectural drawings and obtain the municipality building permit.

Rebar tie-in to columns
Core-drill column tops and epoxy-anchor starter bars for the new frame.

Concrete frame and walls
Pour new columns, beams and roof slab with reinforced block infill walls.

New roof insulation
Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

Full finishing
Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.
How it works.
First contact
Call or WhatsApp us to describe the house and current floor count.
Site visit
We visit to inspect the roof slab and columns and assess their load capacity.
Drawings and permit
We prepare structural and architectural drawings and handle the building permit.
Construction
Tie rebar to existing columns, pour frame and slab, raise walls and roof.
Finishing and handover
Complete all finishes on the new floor then hand over with final drawings.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Rooftop floor addition
Other services in Hassawi
Questions about Rooftop floor addition in Hassawi
Call nowDo you repair cracks in the old roof before adding a floor?
Yes, we inspect all cracks and repair them with epoxy or polymer injection based on their size and depth. New pouring cannot begin until the old slab is confirmed sound.
How long does column reinforcement with steel and epoxy take?
Reinforcing one column with steel and epoxy may take two to three days including preparation, fabrication and installation. Work proceeds sequentially based on the number of columns needing strengthening.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps