
Second-floor addition in Firdous
Adding a second floor in Firdous to an existing structure starts with a full inspection of the columns, foundations and ground slab. We check load-carrying capacity, then pour the new storey and hand it over ready for finishing.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most Firdous houses were built in recent decades on regular plots 25 to 30 metres deep with medium-sized concrete frames. Columns typically measure 40 × 40 cm and ground slabs are 30 cm thick, not originally designed for extra loads. Structural inspection includes ultrasonic concrete strength testing, foundation sampling and measurement of ground-slab deflection under current load, then calculation of the additional load the frame can safely carry.
Firdous is located in Farwaniya governorate near Firdous Co-op and Sixth Ring Road.
Most Firdous house columns measure 40 × 40 cm and ground slabs are 30 cm thick, requiring precise reinforcement study before adding a floor.

What the work covers
Column capacity check through to finished second-floor handover, every stage handled.

Existing structure check
Column and beam dimensions reviewed and visible rebar condition assessed.

Drawings and permits
Approved architectural and structural drawings prepared, municipality permit obtained.

Rebar tie-in to columns
Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

Reinforced concrete frame
Columns, beams and floor slab poured and water-cured to prevent heat cracking.

Block walls and roof slab
Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

Full finishing
Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.
How it works.
First contact
Call or WhatsApp us to describe the project and arrange a site visit.
Site inspection
We visit, measure columns and review existing drawings if available.
Drawings and permit
Structural and architectural drawings prepared and municipality permit obtained.
Structural construction
Rebar tied in with epoxy, columns, beams and slab poured with water curing.
Finishing and handover
Walls, electrical, plumbing and full finishing completed, then formal handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Second-floor addition
Other services in Firdous
Questions about Second-floor addition in Firdous
Call nowWill the ground slab carry the full weight of a second floor on top?
The ground slab was designed only for the ground floor load, not extra weight. We measure its current deflection and calculate if it needs underpinning or an additional central column to transfer the new load directly to the foundations.
Do I need an engineer's structural report after the inspection?
Yes, a sealed structural report from a licensed engineer is required to get municipality approval and begin the floor addition. The report includes calculations and detailed drawings for the new floor.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps