Rooftop floor addition in Farwaniya
Rooftop floor addition on a verified structure in Farwaniya focuses on thorough testing of the existing building roof and verifying foundation adequacy. We run field tests and structural calculations, then add the new floor with proper anchoring to the original frame.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Farwaniya contains a mix of residential houses and apartment buildings of varying heights, and many older projects have insufficient reinforcement or minor concrete deterioration. Before adding the floor, we conduct comprehensive structural survey using non-destructive testing to assess concrete quality and steel distribution. The ground in the area is varied, and some projects may need extra foundation reinforcement or new columns anchored to existing footings. All work requires municipality approval of the revised drawings.
Farwaniya lies in Farwaniya governorate, a dense residential district near Farwaniya Hospital and Third Ring Road.
We use rapid concrete strength tests on the existing slab to determine if reinforcement is needed before adding the new load.

What the work covers
Structural check of the existing roof through to handover of the finished rooftop floor.

Existing roof assessment
Check slab thickness, column capacity and load margin before any work starts.

Drawings and permits
Prepare structural and architectural drawings and obtain the municipality building permit.

Rebar tie-in to columns
Core-drill column tops and epoxy-anchor starter bars for the new frame.

Concrete frame and walls
Pour new columns, beams and roof slab with reinforced block infill walls.

New roof insulation
Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

Full finishing
Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.
How it works.
First contact
Call or WhatsApp us to describe the house and current floor count.
Site visit
We visit to inspect the roof slab and columns and assess their load capacity.
Drawings and permit
We prepare structural and architectural drawings and handle the building permit.
Construction
Tie rebar to existing columns, pour frame and slab, raise walls and roof.
Finishing and handover
Complete all finishes on the new floor then hand over with final drawings.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Rooftop floor addition
Other services in Farwaniya
Questions about Rooftop floor addition in Farwaniya
Call nowCan you add a floor to an older building with minor concrete deterioration?
Yes, but it requires detailed inspection first. If deterioration is superficial and reinforcement is sound, we remove and treat the damaged layer before strengthening. If deterioration is deep, structural reinforcement or partial replacement may be needed.
What are the steps to inspect foundations before adding the floor?
We extract soil samples, measure the dimensions and depths of existing footings, then calculate the soil bearing capacity. Based on results, we determine if the foundations can support the added load or need widening.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.