
Third-floor addition in Firdous
Third-floor addition in Firdous focuses on comprehensive inspection of existing residential buildings and reassessment of their load capacity. We apply full engineering standards and municipality permits before beginning reinforcement, pouring and steel work.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Firdous is a medium-density residential district on regular-sized plots, mainly with two to three-storey residential buildings. Most were built with standard materials and methods but without designs accounting for later floor additions. Inspection of existing foundations, columns and beams is essential to determine the scope of work. In some cases, foundations are sound and the structure only needs reinforcement through additional steel. In others, foundations themselves need reinforcement with added bracing or piles.
Firdous is located in Farwaniya governorate, close to Firdous Co-op and the Sixth Ring Road.
Building and foundation standards in Firdous require separate engineering assessment for each building before municipality approval for floor addition.

What the work covers
Structural assessment through finished, permitted handover of the complete third floor.

Structural assessment
Columns, beams and foundations checked before any new load is added.

Drawings and permits
Architectural and structural drawings prepared and permit submitted to the municipality.

Concrete frame
Columns, beams and slab poured with heat-cured concrete to resist cracking.

Block walls
Block walls tied to the new frame with horizontal bond steel at every third course.

Rebar tie-in
Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

Insulation and finishing
New roof slab insulated and third floor finished to the agreed specification.
How it works.
First contact
Call or WhatsApp us describing the villa and its current floor count.
Structure check
Engineer visits to inspect existing columns, beams and rebar condition.
Design and permit
Architectural and structural drawings prepared and building permit obtained.
Construction
Concrete frame poured and block walls built under continuous engineering supervision.
Finishing and handover
Third floor fully finished and handed over with new roof slab insulated.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Third-floor addition
Other services in Firdous
Questions about Third-floor addition in Firdous
Call nowAre Firdous foundations strong enough for a third floor?
It depends on the building's age and current foundation condition. We inspect foundation depth and current load distribution and assess whether additional reinforcement is needed.
Do you modify column design when adding a third floor?
Yes, often we do. We may increase the thickness of existing columns or add new columns to distribute the added load evenly across the foundations.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps