

What the design covers
A full majlis design from space layout and ceiling concept through to every finish and fitting.

Space layout
Seating arrangement and clear movement zones sized for hosting.

Ceiling design
Multi-level gypsum ceilings concealing AC ducts and integrating light slots.

Wall finishes
Stone cladding, wood panels and paints specified per wall surface.

Decorative lighting
Recessed and cove lighting laid out with dimmer control points.

Flooring and finish schedule
Marble or porcelain selection with border and grout specifications.

Execution supervision
Site follow-up to confirm execution matches the approved design drawings.
Common mistakes in majlis design
Ignoring the AC outlet position
Designing the gypsum ceiling without fixing the cassette position forces a partial demolition later.
Specifying non-washable paint
A standard matt paint shows marks fast in a majlis used for daily hosting.
Unsealed stone cladding joints
Open stone joints collect fine dust from Kuwait's air and become very hard to clean.
Lighting without dimmer control
Single-circuit lighting with no dimmers prevents adjusting the mood for different gatherings.
Before you call us
Current majlis dimensions
Measure length, width and ceiling height so the design estimate can be prepared quickly.
AC unit location
Know the AC type and its position as this controls all gypsum ceiling drop levels.
Preferred style
Collect reference images for the style you want, whether classic, modern Gulf or contemporary.
Existing finish condition
Note any ceiling cracks or wall moisture before the meeting to identify removal works needed.
More in interior decoration.
What goes wrong with most finishing.
The finish is what you see every day, and its mistakes do not hide. These three are the most common.
01A rushed finish
The finish is what you live with every day. Rushing it shows in every corner.
02Four contractors for one finish
Tiling, gypsum, paint and aluminium crews who never talk to each other.
03After-care that never comes
Once you have the keys, it is hard to find anyone to come back and fix what shows up.
The solution?
Full finishing, and maintenance after it, from one licensed company.

A rushed finishTurnkey finishing
Marble, tiling, gypsum and paint from one company.

Four contractors for one finishOne company for every trade
No gaps between the tiler, the gypsum crew and the painter.

After-care that never comesRegular maintenance after handover
And finishing on instalments if you need it.
How it works.
Call or whatsApp
Contact us to fix a site visit and assess the existing majlis condition.
Site survey
We measure the space and document AC, lighting and existing finish conditions.
Design and approval
We submit drawings, sections and a materials board for your review and sign-off.
Execution and supervision
Demolition and installation begin with continuous on-site supervision.
Handover and inspection
Every element is checked against the approved design before final handover.
What sets the price.
No fixed price list applies; these factors combine to shape the quote for your specific majlis.
Get a quoteMajlis area
Total floor area is the primary driver of both design and execution cost.
Ceiling complexity
Multi-level ceilings with indirect cove channels need more material and labour time.
Materials grade
Natural marble and cut stone cost more than porcelain and manufactured stone alternatives.
Demolition required
Stripping old finishes before execution adds cost and affects the work schedule.
Lighting system
Recessed lighting with smart dimmers raises the electrical and fitting costs noticeably.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
Majlis interior design in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Kuwait Fire Force (safety requirements in finishing work)
Questions, answered.
Call nowCan the majlis be designed around existing furniture?
Yes, we take dimensions of existing pieces and build them into the new space plan so the finishes align with what you keep. Replacement is only needed if the piece conflicts with the structural layout.
Is natural marble practical for a majlis floor used every day?
Natural marble is durable enough for daily use if it is sealed properly against staining from drinks and oils, and polished periodically to maintain its surface. Unsealed marble in a busy majlis will mark quickly.
How does designing a majlis differ from a living room?
A Kuwaiti majlis is built for formal hosting with a separate entrance, so the design prioritises entry circulation, formal lighting and perimeter seating density rather than the relaxed daily-use focus of a family living room.
Can thermal insulation be added during the majlis design to cut cooling costs?
Yes, insulation panels can be incorporated behind the outer wall finishes during the fit-out, and specifying double-glazed aluminium frames for the majlis windows reduces heat load noticeably on south-facing and west-facing sides.
Does the design service include execution or is it a separate stage?
Design is a standalone stage ending with approved drawings and a materials schedule. Execution can then be contracted to us separately with site supervision, or the client may use a different contractor with the drawings we provide.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps







