

What the design covers
A full interior design service, from space layout through finish schedules and site supervision

Space planning
Room layout and traffic flow planned around how the space is actually used

Finish schedule
Every floor, wall and ceiling finish specified before any work begins

Lighting and decor layout
Recessed and cove lighting positions coordinated with electrical drawings

Joinery and cabinetry design
Detailed drawings for built-in units, doors and fitted storage

Colour and fabric selection
A consistent palette matched to Kuwait's intense natural light and interior mood

Design supervision
On-site checks to confirm work matches the approved design drawings
Materials and methods the designer specifies
Heat-stable stone and porcelain
Low-absorption tiles are specified so thermal expansion cycles do not cause cracking or loose joints over time
Washable interior paint
Paint sheen and binder type are chosen to resist coastal humidity and fine dust that works into wall surfaces
Double-glazed aluminium frames
Frame profiles and glass specs are set to cut heat gain and reduce glare without blocking natural light
Moisture-resistant gypsum board for ceilings
Used in suspended ceilings to conceal AC ducts while tolerating condensation from the temperature gap between duct and room
Common mistakes in interior design projects
Ignoring AC outlet positions
Placing furniture or curtains in front of AC vents disrupts air distribution and raises cooling costs noticeably
Specifying materials without a written schedule
Verbal-only material agreements allow contractors to substitute finishes during work without the owner noticing
Planning lighting as an afterthought
Adding lighting points after concrete is cast requires cutting ceilings and re-routing cables at double the original cost
Light-coloured walls on sun-facing interiors
Very pale finishes on west and south-facing interior walls yellow prematurely under Kuwait's intense UV exposure
More in interior decoration.
What goes wrong with most finishing.
The finish is what you see every day, and its mistakes do not hide. These three are the most common.
01A rushed finish
The finish is what you live with every day. Rushing it shows in every corner.
02Four contractors for one finish
Tiling, gypsum, paint and aluminium crews who never talk to each other.
03After-care that never comes
Once you have the keys, it is hard to find anyone to come back and fix what shows up.
The solution?
Full finishing, and maintenance after it, from one licensed company.

A rushed finishTurnkey finishing
Marble, tiling, gypsum and paint from one company.

Four contractors for one finishOne company for every trade
No gaps between the tiler, the gypsum crew and the painter.

After-care that never comesRegular maintenance after handover
And finishing on instalments if you need it.
How it works.
First contact
Call or WhatsApp to describe the project and your general vision
Site visit
Designer visits to measure spaces and assess existing conditions
Concept design
Initial layouts, colour board and material references submitted for your review
Construction drawings
Detailed drawings and final finish schedule handed to the execution team
Supervision and handover
Periodic site checks to confirm work matches drawings before final handover
What sets the price.
No fixed rate applies; the quote depends on project scope and several site-specific factors
Get a quoteTotal project area
More rooms and spaces mean more drawings, schedules and coordination hours
Level of detail required
Full construction-ready drawings with schedules cost more than a concept-only presentation
Built-in joinery scope
Designed built-in units add drawing stages and coordination with joinery contractors
On-site supervision
The number of site visits to check design compliance affects total fee
Revisions after approval
Changes requested after drawings are approved require additional rounds that add to the fee
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
Interior designer in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Kuwait Fire Force (safety requirements in finishing work)
Questions, answered.
Call nowCan the designer work on a single room rather than the whole property?
Yes. A single room such as a master bedroom or sitting room can be designed independently. The designer can also check that the new scheme relates well to adjacent spaces if that matters to you.
What is the difference between an architect and an interior designer?
An architect deals with structure, facades and building permits. An interior designer focuses on the inside: space arrangement, finishes, lighting and fitted furniture, usually after the shell is complete or during the finishing stage.
Does the interior designer advise on loose furniture as well?
Furniture recommendations can be included in the scope if requested. The designer would suggest dimensions, styles and arrangements that work with the approved scheme, without sourcing or purchasing on your behalf.
How does the designer handle existing items the client wants to keep?
Existing pieces are drawn into the plan and the new finishes and colours are chosen to relate to them. This is common in Kuwaiti villa renovations where owners keep quality items and update the surrounding scheme.
Do the designer's fees include the cost of materials and execution?
No. Design fees cover the drawings, schedules and supervision visits only. Material costs and execution labour are priced separately by the finishing team and agreed directly with the owner.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps







