Architectural design & drawings in Kuwait - Firdous

Architectural design & drawings in Firdous

Approved drawings in Firdous start with boundary surveys and end with complete construction plans for structure and services. We deliver topographical surveys, structural layouts and electrical schematics certified by the municipality before any equipment lands on site.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Firdous is a residential district dominated by single-family villas on medium-sized plots, with a few apartment blocks and open land under development. Drawings here require careful study of mandatory setbacks and minimum plot coverage under the code, especially around entrances and interior courtyards. The proximity to Sixth Ring Road also mandates review of safety clearances and surface drainage in the plan before final approval.

Firdous sits in Farwaniya governorate, a residential district stretching between Sixth Ring Road and the interior areas.

Most villas in Firdous sit on plots between 600 and 900 square metres with side and front setbacks of not less than 1.5 metres.

Back to Architectural design & drawings

What the drawings cover - Architectural design & drawings

What the drawings cover

Every set from boundary survey through structural layout to approved electrical plan

  • Plans by plot size

    Layouts drawn to your exact plot dimensions and municipality setback rules

  • Single-storey villa plans

    Full architectural set for one-level houses including room layout and facades

  • Two-storey villa plans

    Upper and lower floor layouts with stair positioning and structural coordination

  • Electrical layout drawings

    Circuit diagrams showing panel positions, outlet runs and lighting points

  • Plot sketch (kroki)

    Boundary sketch confirming plot shape, corners and access points before design

  • Land surveying

    On-site measurement of levels and boundaries for an accurate drawing base

How it works.

  1. Call us

    WhatsApp or phone to share your plot number and goals

  2. Site visit

    Engineer visits the plot to measure and record boundary details

  3. Draft review

    You receive the draft floor plans and request any changes

  4. Final drawings

    Corrected set is prepared with engineering stamp and signatures

  5. Permit submission

    Complete drawing package is ready for municipality permit application

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Architectural design & drawings in Firdous

Call now
What steps are needed to get the structural drawing approved in Firdous?

We conduct a boundary survey, create the structural layout per the building code, then submit it with geotechnical studies to the municipality. After the engineering department reviews it, the municipality issues approval or requests revisions.

Are electrical and drainage plans part of the approved drawings?

Yes, the electrical plan and drainage and water route maps are signed by a licensed engineer and submitted to the municipality along with the structural layout before construction begins.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works